Laserfiche WebLink
b. PIPING SU 'FEST ING <br /> Test Method Developed Ey: Sump Manufacturer ✓ Industry Standard 0 Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum ✓ Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: *t-0.002 Inches <br /> x w <br /> _# il <br /> Sump teS@E Sump Sump# Sump <br /> Sump Diameter: 42" <br /> Sump Depth: 72" ;. s 1? V L. <br /> Sump Material: F=iberglass <br /> Height from Tank Top to Top of 1811 1\ii, i <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 151( <br /> Electrical Penetration: ENVIRONMENTAL <br /> Condition of sump prior to testing: Good EPARTMENT <br /> Pardon of Sump Tested' 2"Above Pipin <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ElYes o ✓ A ®Yes o NA Yes[] No []NA ❑Yes 13No []NA <br /> product and water?, <br /> Turbine shutdown response time N/A N/A N/A NIA <br /> Is system programmed for fail-safe Yes No ✓NA Yes ao NA El YesO No NA ❑Yes ENo NA <br /> shutdown?` <br /> Was fail-safe verified to be <br /> ® <br /> Oerational?` Yes No ✓NA Y [ Na NA Y ❑No NA El Yes Na NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> test: <br /> Test Start Time: 10:11AM <br /> I Reading(l2c}: 2.701 a Inches Inches Inches Inches <br /> Test End Time: 10:2AM _ <br /> Final Reading(RF): 2.7811 Inches Inches Inches Inches } <br /> Test ration: 15 Minutes <br /> Change in Reading(RF-&): 0.0004 _ <br /> Pass/Fail Threshold or Criteria: 0.002 — 0.002 0.002 0.002 <br /> Test_R -ult-. ✓Pass OFeR Opass DFail, psss � ail CIPPES OFail <br /> Was sensor removed for testing? ®Yes o �]✓NA ❑Yes Na A Yes ®No [:]NA [)Yes ®No NA <br /> Was sensor properly replaced and Iyes []'No R✓NA Yes [3No NA Yes EjNa NA Yes No [7NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment <br /> testing scope of work". <br /> Replaced test boot in Diesel STP sump. Retested. <br /> t <br />