My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SW* <br /> WRCB,January 2002 Pae of <br /> 6. PIPING SUMP TESTING <br /> , est Method Developed By: ❑Sump Manufacturer ❑Industry Standard xprofessional Engineer <br /> .D Other(Spec6) <br /> Test Method Used: 0 Pressure ❑VacuumA ydrostaric <br /> D Other(Spec) <br /> Test Equipment Used:(::q ! W el i ; Equipment Resolution:.Oos <br /> Sump# Sump# '2-- S mp.# Sump# <br /> Sump Diameter: <br /> Sump Depth: a W V k 4 t r r <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hi est Pipft Penetration: I t-7 ' <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: . <br /> Condition of sump prior to testing: Dr <br /> Portion of Sump Tested' w -crLaL L`�' ` Ott <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes D No D NA <br /> roduct and water Xes D No DNA ❑Yes o q NA ❑Yes /No 'DNA <br /> ?` <br /> Turbine shutdown response time 3 gc-< , <br /> Is system programmed for fail-safe es D No DNA Yes ❑No ❑NA D Yes jNo D NA D Yes No DNA <br /> shutdown? <br /> Was fail-safe verified to be es 0 No ❑NA es D No ❑NA ❑Yes o D NA 0YANo- <br /> DNA <br /> rational? <br /> o <br /> Wait time between a l ing <br /> pressure/vacu ater starting <br /> test: 10 r'-1 i",-a{ �' <br /> Test:Start Time: <br /> Initial Reading(R): t rs} �, `' �Y j-CX <br /> Test End Time: <br /> Final Reading(RF) rs - <br /> Test Duration: 3o wine- 3®�►w � 5 <br /> Change in Reading ORF-Rot <br /> Pass/Fail Threshold or Criteria: 3Q - <br /> �E'�st <br /> Was sensor removed for testing? es D No ONres <br /> es D No ❑NA 0 D No. 0 A D Yes ❑No ❑ A <br /> Was sensor properly replaced and yes ❑No D NA D No DNA Yes D No 0 D Yes D No ❑ <br /> verified functional after testin ? NV <br /> Comments— include Information on re airs madeprior to.testing, and recommended ollow-u or failed tests <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to gRy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.