Laserfiche WebLink
C,If 441 -1 LIU., 'I 3.`4J r IF I" ruk)Or <br /> Sorage Tank Monitori <br /> erng Plan <br /> Undgrt <br /> oud <br /> For tue by Locell.furisdicnon <br /> A rahon'fy Cited, Title 23 CCR,Sections 2632(d)(I), 263 4(d)(2,,and 1641(1+) <br /> Califoriiia Underground Storage Tank (UST) Regulations require that facilities with USTs have a W-6tten <br /> monitoring plan describing equipmcm and ptocedures used to monitor tank systems for leak-s.The plan must be <br /> approved by the local UST iegulatory agency. If your facility already has a plan which has becii approved by <br /> the local agency that regulates UST's in your jurisdiction, do not complete this document unless directed to do <br /> so by your local. agency. This boilerplate plan is suitable only for the monitoring methods described below- if <br /> other methods are used,a different formaLt may be required. <br /> Monitoring plans must be revised and 9uhmitted to your local agency within 30 days of any personnel change or <br /> other situation which affects the information they contain- Changes in UST mcnizonng equipment or <br /> a <br /> procedures require submittal of a revised plan to your local agency for review and approval 26or to <br /> implementation. A cixffrnl copy of the plan must be kept at the tank site.. <br /> A. General Informalien <br /> Facility Name: C- 0)1,1,. <br /> llf--I ( "�>ad4ric, Ave, . <br /> Site Address-. T12 City: 6+0 C1+5n <br /> LVI Tank and piping morutoring is idenihcal for all USTs at this facility, or <br /> LJ This plan covers only the followbig tark(s)- <br /> 0 <br /> No electronic leak detection s,y<stemsm used tornmitor U,5Tsysterns cuvcrud by this plan; or <br /> I <br /> The fdllowing type of electronic monitoring system perforns leak detection monitoring for UST systems <br /> covered by this P)an. <br /> Manufacturer: 7--n c.0 n &144noy '40dcl No. TS-100 <br /> D. 'Tank Monitoring <br /> Tank onitoring is performed using the following methods: (Check all which app(y) <br /> Continuous electronic monitoring of tank amular(interstitial)space or secondary contaiwncntvault, <br /> Leak SengorManufacturet: Model NO: <br /> Automatic Tank Gaup'ng(ATG)systern„sed tomon' <br /> gj Ito <br /> In-Tank Probe Manufacturer: Model No.: <br /> Frequency of Leak Tests Continuous(e.g. CITLD,CSLD),El Baily/Nightly;Deckly;�W <br /> Monthly; F-1 Otber(specify): <br /> Programmed Test Leak Threshold: Lj 0.1 g.px' E]0-2 g,p-h- <br /> r "A,-- a]luvcatory ReconciNabon Rh ,'p. <br /> Weekly Manual Tank Gau*g-TcstinS Period is: D 36 hours; L 60 hours. <br /> Tank Tightness Testing- Conducted: Annually; Monthly, Other(specift): <br /> Other (spec!&- <br /> UN-022A-V6 <br />