My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VALUED ENGINEERING 209464 <br />Mlultiple tank installation will also requ a <br />minimum of 12 inches between tank measured from <br />each outride edge. <br />ANCHORING <br />7,0 Certain situations require the use of properly <br />designed anchor straps to overcome existing <br />buoyant forces. The straps are used in conjunction <br />with a concrete holddown slab or deadman <br />anchurn. <br />CAUTION, Use of steel cable or round <br />bar is prohibited. <br />Im USE of strct <br />C -OL E ANG RUUNO OAA <br />HOLD DOWN STRAPS <br />7.1 A pad of inert, isolation dielectric material must <br />be used to separate the steol anchor strap from the <br />tank. Isolation pads are not required when the holddown <br />strap material is approved fiberglass or polyester webbing, <br />BACKFILL <br />8.0 Only the following approved backfill material may <br />be used. <br />1, Clean washed sand. <br />2. ]Ped Gravel • (particle size must be not leas than <br />1/8 inch or more than 314 inch) <br />3, Washed stone or gravel crushings - <br />(angular particle size required to be not less <br />than 118 inch or mere than 112 inch) <br />8.1 Special care should be used to ensure that the <br />backfill is properly installed to evenly support the <br />bottom quadrant of the tank. <br />NOTE: Do not backfill in layers using different <br />materials, <br />9Q04h <br />W <br />8565 05/28/09 02:26pm P. 008 <br />8.2 If tank must be ballasts wring the backfill <br />procedure, at no time may the liquid exceed the <br />height of the compacted backfill surrounding the <br />tank. <br />8.3 The tank shall be encompassed by the proper <br />backfill and extending to a minimum of 12 inches <br />over the top of the tank. <br />8.4 Areas subject to heavy vehicular traffic shall have <br />a protective cover of 18 inches clean. compacted <br />soil with either 6 inches of reinforced concrete or 8 <br />inches of asphalt paving. If compacted soil is the <br />only cover, it shall be a minimum of 36 inches <br />deep. <br />8.5 Areas not subject to heavy vehicular traffic shall <br />have a protective cover of a minimum 18 inches of <br />clean compacted soil covered by 4 inches of <br />reinforced concrete or 6 inches of asphalt paving, If <br />wcttpacted soil is the only cover, it shall be a <br />minimum of 24 inches deep. <br />8.6• Finishing Instructions; A fiberglassing kit is <br />shipped with tank and provides materials to cover <br />unused openings and external attachments, such <br />as lifting lugs. All finishing work will be done <br />prior to backfilling. <br />9.0 For Glasteel II warranty to be initiated, the <br />Installation Checklist tau be properly filled out <br />by the customer, and returned to the Modern <br />Welding Co. subsidiary from which the tank was <br />fabricated. The Installation Checklist must be <br />returned within 30 days after date of installation, If the <br />Glasteel 11 tarlk hay not been installed within 90 days of <br />delivery from the manufacturer, it is required that the tank be <br />re -certified by the manufacturer, at the owner's expense, prior <br />to installation, <br />MAINTENANCE <br />10.0 Maintenance of Underground Storage Tanks <br />The primary tank should be inspected monthly for the <br />presence of water. Inspections should take place at the <br />lowest possible points inside the primary tank. Retttove <br />any water found. Water and sediment in fuel can cause <br />plugging of filters. Also, bacterial growth originating from <br />the fuel, can cause filters to plug and eorrasiou of tanks <br />and lines. A report by the U5 Department of Energy, <br />BNL 4.8406, provides information on methods to teat for <br />and remove water, test for bacterial presence in fuel, tank <br />cleaning and fuel additives. Failure to remove water from <br />the tank may void your warranty. <br />Corporate Office (270) "54400 <br />Modern Welding Company of Owensboro, Inc (270) 683-5323 <br />Modern Welding Company of Ohio, Inc (740) 344-9425 <br />Modern Welding Company of Florida. Inc (407) 843.1270 <br />Modern Welding Company of Texas, Inc (713) 6754211 <br />Modern Welding Company of Texas, Inc (817) 636-2216 <br />Modern Welding Company of Iowa, Inc (319) 754-6577 <br />Modern Welding Company of California, Inc (559) 275-3353 <br />Modern Welding Company of Georgia. Inc (706) 722-3411 <br />FORM Gneiss, 01.2001 MWCo <br />R <br />A <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.