Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: "t,r <br /> Complete the following checklist: <br /> es I ❑ No* Is the audible alarm operational? <br /> lalyss ❑ No* Is the visual alarm-operational? <br /> ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operateelectrically disconnecte ,,If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ump/Trench Sensors; ispenserConta' nt Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? es; ❑No. <br /> ❑ Yes ❑ No* . For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating ro erl ? If so,at what percent of tank cRacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and Iist the manufacturer name and model for all re lacement- arts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if a licable <br /> Yes ❑ No* Is all mon!!2ft equipment 2erationmanufacturer's s ecifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />