My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2003-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:32:22 PM
Creation date
6/3/2020 9:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2008
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2003-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR EquVent: U-Check this box if tAgauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: -ce <br /> C3 Yes 13 No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> U Yes U No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> U Yes U No* Was accuracy of system product level readings tested? <br /> U Yes U No* Was accuracy of system water level readings tested? <br /> U Yes U No*--] Were all probes reinstalled properly? <br /> U Yes U =Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): Ll Check this box if LLDs are not installed. <br /> Com fete the folio ing checklist: <br /> Yy-es 13 No* For equipment start-up or annual equipmentce ireation, was a leak simulated to verify LLD performance?" <br /> U N/A (Check all that apply) Simulated leak rate: g.p.h.; U 0.1 g.p.h; Ll 0.2 g.p.h. <br /> s LJ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> s 13 No* Was the testing apparatus properly calibrated? <br /> EY Yes U No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Ll N/A <br /> I U Yes (3 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Ll Yes Ll N For electronic LLDs, does the.turbine automatically shut off if any portion of the monitoring system is disabled <br /> �ZA or disconnected? <br /> U Yes Ub* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> Ef N/A or fails a test? <br /> LlZY . L3Xo* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Ed N/A <br /> M Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.