My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
2300 - Underground Storage Tank Program
>
PR0231342
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 2:57:00 PM
Creation date
6/3/2020 9:46:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231342
PE
2361
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
01
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231342_1301 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please submit the required $24.00 (see enclosed fee worksheet). <br /> 1 7. The owner/operator needs to sign page nine. Vop--�r-- � <br /> INSTALLATION - INc� � = 3 c �`D• �_ <br /> The State Water Resources Control Board Form "C" needs to be submitted <br /> after the project is completed. kid7�D <br /> �2. You need to submit buoyancy calculations for the tanks. (Please note the <br /> calculations need to be stamped by an engineer). 3 coe%E�5 INGt.-. P� - <br /> �r U N <br /> ✓3. You need to complete page five of the installation application numbers 1-11. <br /> N <br /> por-- . APL's , s - (acv O_ e, 15-• <br /> / 4. Which OPW spill container will be installed, OPW 1-4000 or OPW 1-4580? <br /> A. Two specification sheets were submitted for the secondary containment below <br /> the dispensers. Will the Teleflex fluid system or the Containment Technologies <br /> secondary containment be installed? `� <br /> ✓6. The owner/ perator must sign page eight of the application. Doo <br /> �/. Three sets of specification sheets vJcere not submittecL Please submit wo <br /> additional sheets for the pipir(g, tank, and ContainrrTent Technologies <br /> seconpry containmept boot. Please submit one additional sheet for the OPW <br /> spill box, OPW 61 SO, Red Jacket pump, Red Jacket leak detector, Gilbarco <br /> EMC, Teleflex secopoary and pri7ry flexible connectors. �Nc -os+eo, <br /> If you have any questions I can be contacted at (209) 468-0333. <br /> ank you for your cooperation, <br /> ric reve R.E.H. <br />
The URL can be used to link to this page
Your browser does not support the video tag.