Laserfiche WebLink
Please submit the required $24.00 (see enclosed fee worksheet). <br /> 7. The owner/operator needs to sign page nine. <br /> INSTALLATION <br /> ` <br /> 1. The State Water Resources Control Board Form "C" <br /> after the project is completed. needs to be submitted <br /> 2. You need to submit buoyancy calculations for the tanks. (Please not <br /> calculations need to be stamped by an engineer). a the <br /> 3. You need to complete page five of the installation application numbers 1- <br /> 11. <br /> 4. Which OPW spill container will be installed, OPW 1-4000 or OPW 1-4580? <br /> 5. Two specification sheets were submitted for the secondary containment <br /> below <br /> the dispensers. Will the Teleflex fluid system or the Containment Technolo ie <br /> secondary containment be installed? gees <br /> 6. The owner/operator must sign page eight of the application. <br /> 7. Three sets of specification sheets were not submitted. Please submit <br /> two <br /> additional sheets for the piping, tank, and Containment Technologies <br /> secondary containment boot. Please submit one additional sheet for the OPW <br /> spill box, OPW 61 SO, Red Jacket pump, Red Jacket leak detector, Gilbarco <br /> EMC, Teleflex secondary and primary flexible connectors. <br /> If you have any questions I can be contacted at (209) 468-0333. <br /> ank you for your cooperation, <br /> ric reve R.E.H. . <br /> ° <br />