My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
2300 - Underground Storage Tank Program
>
PR0231342
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 4:04:58 PM
Creation date
6/3/2020 9:46:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231342
PE
2361
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
01
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231342_1301 W KETTLEMAN_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oRAufN c0' <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />N: < <br />.. 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.s*gov.org/ehd <br />q�%PORE <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />Inspection Date: <br />Spill bucket ❑ minimum 5 gallon <br />Leak detector <br />Facility Address: <br />I e:�O I W I ? art Lr'i � l G% <br />Service Request #: <br />S (Z Ob 5 878 <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Exp. Date: <br />Manufacturer Training: <br />I'Dii, �, s rd �( <br />-5'11 <br />U� e 11-��-16 A <br />SERVICE <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />Leak detector <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ <br />❑ mechanical <br />Model: <br />Spill bucket ❑ minimum 5 gallon <br />❑ electronic <br />Serial #: <br />❑ line test programmed <br />Spill bucket ❑ minimum 5 gallon <br />Leak detector <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ <br />❑ mechanical <br />Model: <br />Primary piping testing at: <br />❑ electronic <br />Serial #: <br />❑ line test programmed <br />Secondary containment testing for: <br />Leak detector <br />UDC(s) Piping <br />❑ <br />❑ mechanical <br />Model: <br />Testing for the above components are next due by: <br />❑ electronic <br />Serial #: <br />❑ <br />❑ line test programmed <br />❑ <br />81 41 sensor <br />a6 'Trp suiI <br />Other: see below <br />;Vposltive shutdown <br />Model: 2hA <br />Ofail safe <br />Serial #: <br />❑ NA <br />2 sensor <br /><< ti `VP -X L^ -111111114C <br />❑ positive shutdown <br />Model: 0(o <br />❑ fail safe <br />Serial #: 1 11 u.- <br />❑ NA <br />C);Mj I q I sensor <br />❑ positive shutdown <br />Model: qk, <br />❑ fail safe <br />Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfi at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />... •la 1...1iw <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />r . (. <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />Other: see below <br />EI 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />... •la 1...1iw <br />1�F1 A� �1 <br />THIS FACILITY IS SUBJECT TO REINSPE•AT ANY TIME AT EHD'SHOURLY <br />r . (. <br />EI 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.