Laserfiche WebLink
t t <br /> VCS-400-7 VAPOR L SYST' — <br /> L OF niSrALTATICN AND START-UP <br /> Be sure the Hirt VCS-400-7 is installed as Per Carb Executive order G-70-177 and <br /> this cmanual. <br /> Attached are location, interconnection and start up instructions for the VCS-400-7 <br /> processor and vapor control system ts. <br /> NM: These instructions are written to instruction give the �ttn installation <br /> in this manual <br /> easiest for the installer. If there is any instable for your installation, <br /> which seems impossible, inpractical, or quer <br /> call us first or your local distributor. <br /> for this system may be manifolded bo <br /> The Stage II vapor return piping or individually <br /> return to one underground storage tank (lowest grade tank?, y <br /> returned from each product dispenser to its respective tank. See FIGURE S on <br /> pages 13 and 14 "VAPOR RL•MM PIPE gp(ITM. <br /> COIF MUS <br /> 1. stents of Shipment <br /> 2. Vapor Return Piping <br /> 3. Vapor Return CoIMPonents <br /> 4. installation of Processor, Qontrol Panel, and current Sensing Relay <br /> S. Installation of Associated Equipnnernt <br /> 6. Start-Up <br /> 7. Final Adjustments <br /> 8. Figures <br /> 9. Schematic Diagram <br /> 10. Parts List and ReccmTended Spare Parts List <br /> 11. Product Warranty <br />