My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:50:07 PM
Creation date
6/3/2020 9:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> 1. oMnsM OF SHIPMENr: <br /> 1.1 A complete VCS-400-7�v�rs nozzles�ptem includes all of the rocessor, and vapor piP'�9 parts, . <br /> hosess breakaways, spline Most of these items <br /> required too conserve and recover ga The t consists <br /> are standard locally available ocau ercial • <br /> of the following: <br /> 1.1.1 Processor - 24" x 24" x..41" 170 lbs. <br /> 1.1.2 oontrol/Alaxm/Record panel - 10" x 10" x 6" <br /> 1.1.3 Pressure/Vacu m Gage - 5" Dia. x 2" <br /> 1.1.4 Pressure/Vacuum Valve - 2" Dia. x 7" <br /> 1.1.5 Current Sensing Relay - 2" x 3" x l" <br /> 1.1.6 Installation and Start-up Manual <br /> 1.2 Pressure/Vacuun Gage, Pressure/Vacucem Valve, and Qlrrent Sensing Relay <br /> are packed inside the processor's stack. <br /> 2. VAPOR REM M PIPING: <br /> Vapor return piping is that piping which takes the vapors from the d'Rmnsers <br /> to the storage tanks. <br /> N=: In the vapor control system, the vent risers from all gasoline storage <br /> tanks are manifolded together at their tops, therefore the vapor return <br /> piping way be either: One pipe frcm all dispensers to one storage tank <br /> or any other vapor return piping approved for the VCS-400-7 stage II <br /> system (see FIGURE 5, pages 13 and 14 and FIGURE 3, page 11) . <br /> 2.1 One 3/4" NPT rises under a dispenser can acoomodate the vapor from no <br /> more than 1 bootless nozzle. <br /> 2.2 one 1" NPT pipe can aeoomzmdate the vapor from no more than 2 bootless <br /> nozzles which can dispense simultaneously. <br /> 2.3 One 2" NPT pipe can accanodate the vapor from no more than 5 bootless <br /> nozzles which can dispense simultaneously. <br /> 2.4 To acc-cnmodate vapor from 6 or more simultaneously dispensing bootless <br /> nozzles, uses 3" NPT pipe. <br /> 2.5 All vapor return piping must enter at least one storage tank at the end <br /> apposite the end where the vent riser exits. <br /> ti <br /> �e <br />
The URL can be used to link to this page
Your browser does not support the video tag.