My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:50:07 PM
Creation date
6/3/2020 9:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.4.2 Gasoline Vapor - (see FIGURE 3, page 11.) The processor is <br /> connected to the vent riser manifold by a 2" NPT galvanized pipe. <br /> Manifold to be mi.nimxn 12 ft. above grade. This pipe must rise <br /> continuous frim manifold connection to processor connectialI <br /> -"supported about every 8 ft. of its span to prevent trapping <br /> liquid in droops or sags in the pipe. If pipe frau vent riser <br /> manifold can not rise continuously to processor, install low point <br /> drain per Case 2, FIGURE 3. Pipe connection at the processor is <br /> with two l" NPT nipples, 1" NPT anion, and l" NPT to 2" NPT bell <br /> reducer. *Piping on the roof must be galvanized and may not be <br /> figerglass. <br /> Caution: Hold processor pipe train coupling. with wrench to <br /> Prevent twisting internal pipe train while connecting vapor piping. <br /> All gasoline tank vent risers must be connected to manifold: No <br /> vent risers frac► tanks not ppnt-uining gasoline are to be connected <br /> into the manifold. No diesel, no oil, no hoist vent, etc. <br /> 4.4.3 Current Sensing Relay - (To sense station's gasoline dispenser <br /> status.) This is an electrical connection, fram Terminal (1) to <br /> Terminal (8) in the processor, through the switch in the current <br /> sensing relay. This switch closes when any one or more gasoline <br /> dispensers is ON. Its purpose is to bypass the lesser vacuu¢n <br /> switch and cause the greater vacucsn switch to control when one or <br /> more customers are dispensing gasoline. The wiring do____es-not <br /> supply external electrical power to the processor. It is a <br /> passive jumper. The Current Sensing Relay may be located: anywhere <br /> convenient, usually in the station's main electrical panel where <br /> the product pump wires are. <br /> --------� Current Sensing Relay. <br /> Hot conductor #1 lead, (usually <br /> red) , one from each gasoline <br /> product pump. =wires Waist <br /> go through the hole in the sacra' <br /> direction (to avoid signal <br /> cancellation) . One pass through <br /> � for 115 V product puucp motor. <br /> Two passes (loops) for 220 V <br /> product motor. <br /> TO a <br /> To <br /> 5. WSTALLATION OF ASSOCIATED EQUIPMENT: <br /> 5.1 Manifold the vent risers together at their tops and install the pressure/ <br /> vacutm valve per FIGURE 3, page 11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.