My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:50:07 PM
Creation date
6/3/2020 9:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.6 if the pilot and main do not ignite after the juapers have been connected <br /> for 15 minute*, it is probably because there is an air leak in the vapor <br /> piping and air is entering.as fast as it is being purged. Chech the pipe <br /> fittings, vent riser manifold® /vacuum valve, storage tank fill <br /> bko caps, <br /> dry breakgaskets and oMMr cap gaskets, hoses, bootless nozzles, <br /> and vapor valves - any place where air wild be entering the vapor. Then <br /> go���bac k to 6.4. <br /> ' 7. AWLS"IMM: <br /> The vacuum switches In the processor are adjusted and set at the factory during <br /> final funct=ial test. These settings will be satisfactory for the great <br /> majority of insta3 lations. n-,e following Nests are to see if any fine bxdng <br /> is needed to match ttp processor to the specific station on whiff you have <br /> installed it and also as an end to end system de anstratim. <br /> 7.1 Test #1: To check setting of lesser vactmsa switch <br /> 7.1.1 Condition of system for conducting test: <br /> Processor PORM IAM and' 'IAW intennittently illuminated. <br /> No customers dispensing gasoline. <br /> All product puqvOFF• <br /> All nozzles hanging on their hooks. <br /> 7.1.2 Result of test: <br /> Pressure/vacuun gage (FIGURE 4, page 13) should read between <br /> -4.2" W.C. and -4.3" W.C. If so, go to steep 7.2. If not, <br /> adjust lesser vacu= switch (FIGU2E 7,page 15) to get that reading. <br /> 7.2 Test 92: To check setting of HF vadum switch. <br /> 7.2.1 Turn off electrical power to processor. Disconnect jtsper wire <br /> between TTe�l [LO] and Terminal (23] in the pressor e s <br /> electrical panel. Removal of the jurper disconnects the main <br /> solenoid valve. Tun on electrical power to processor. <br /> 7.2.2 Cloarditiois of system for. condmting test: Sarre as 7.1.1 except <br /> one or more dispensers (product pub) 'CN. <br /> 7.2.3 Result of test: <br /> Pressure/vacLu n gage (FIGURE 4, page 3-2) should read between <br /> 4,350-W.C,. and -4.65`W.C. If so, go to step 7.2.4. If not, <br /> adjust HF va== switch (FI 7, page 15) to get that reading. <br /> 7.2.4 Turn off electrical power to processor• Reconnect myper wire <br /> bet mm Twfinal [10] and wnWnal (23] in the processor's <br /> electrical panel. Turn on electrical power to processor. <br /> 'c <br />
The URL can be used to link to this page
Your browser does not support the video tag.