My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:50:07 PM
Creation date
6/3/2020 9:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.3 Test #3: To check setting of greater vacuum switch. <br /> 7.3.1 conditions of system for conducting test: Same as 7.1.1 except <br /> one or more dispensers (Product ) ON. <br /> 7.3.2 Result of test: <br /> Pressure/vacuum gage should show an increase in vacuum to at least <br /> -4.5° W.C. If so, go to step 7.4. If not, adjust greater vacuum <br /> switch (FIGURE 7, page 15) bo get that reading. <br /> NO►I'B: If the owner wants bo see a demonstration of the new system, <br /> tests 7.1, 7.2, and 7.3 are a meaningful end to end system <br /> demonstration. <br /> 7.4 Be sure all mechanical connections, electrical connections, and panel <br /> covers are secure. <br /> At this point the station owner needs to call the local pollution <br /> authority for inspection and initializing of the VC5-400-7 Vapor <br /> Revery System. once the authority has finished the inspection and <br /> initializing, the installation and start-up are ocniplete, and the <br /> system is in normal automatic operational mode. <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.