My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 3:50:07 PM
Creation date
6/3/2020 9:46:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Install the pressure/vacuum gage per FIGURE 4, page 12. <br /> START-UP: <br /> If all instructions thus far have been followed, the system should start itself <br /> and run autamatically. Proceed with the following steps: <br /> 6.1 Beck to see that bootless nozzles are on their hangers, vapor hoses are <br /> connected, and pressure/vacuum valve is closed. Check also to see that <br /> gasoline storage tank fittings (fill caps, dry breaks, drop tubes, etc.) <br /> are seated and sealing. <br /> 6.2 At the system control panel, turn the CN/OFF switch M. The laffp labeled <br /> "Power" should illuminate immediately. <br /> WARNING: The processor is automatic. It will cycle its thermal oxidizer ON <br /> if vacuum diminishes in the vapor piping, and OFF if there is <br /> sufficient vacuum. Therefore use caution in looking down the stack <br /> and in working close to the main thermal. oxidizer. It may cue GN <br /> without notice. A mirror is recamuended for looking down the stack. <br /> 6.3 If the L%V labeled "Vacuum" is OFF, check to see that turbine is running <br /> and either there is a flame (main or pilot) or spark (one should be able <br /> to hear this without taking off a side ower) - If not, reset thermal <br /> switch inside electrical panel. Turbine and spark should come on. <br /> 6.3.1 Within 30 minutes, the lamp labeled "Vacuum" should illuminate. <br /> This indicates that the processor is completely functional and <br /> controlling itself automatically. If so, go to step 7. If the <br /> vacuum lamp does not illuminate within 30 minutes or if your work <br /> schedule is such that waiting 30 minutes is inconvenient continue <br /> with the following steps. <br /> 6.4 The turbine in the processor should be running and the ignitor/sensor <br /> probe sparking but the pilot will not be ignited. Failure of the pilot <br /> to ignite is probably because the station's vapor piping is full of air. <br /> To purge this air and replace it with vapor, use 2 short pieces of <br /> insulated electrical wire and jump the circuit from terminal (1) to 191 <br /> and (9) to (101 at the terminal strip inside the electrical panel inside <br /> the processor. Note on the schematic of page 17 that a (1) to (9ljuaper <br /> energizes the turbine, ignitor, and pilot solenoid. A (91 to (101 jumper <br /> energizes the main solenoid <br /> As soon as the air is purged froze the vapor piping, the pilot and main <br /> stage will both ignite. As soon as pilot and main ignite, the 2 jur ers <br /> must be removed, and the processor will be in normal automatic made. <br /> 6.5 Check setting of pilot adjustment valve to get pilot to have 2 tongues <br /> of flame 1" to 2" long, steady, blue with sane yellow at outer tips. A <br /> good starting point can be reached by turning valve knob counter clock- <br /> wise until it is closed and then opening valve knob with approximately <br /> 21* clock-wise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.