My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />FEB 0 3 2017 <br />ENVIRONMENTAL HEALTH <br />1. FACILITY INFORMATION DEPARTMENT <br />Facility Name: USA/Tesoro # 68152 Date of Testing: 1/5/17 <br />Facility Address: 401 W. Kettleman Ln. — Lodi CA 95240 <br />Facility Contact: Patricia Moreno Phone: (209) 368-8787 <br />Date Local Agency Was Notified of Testing: 12/27il6 5B989 — 3yr. Compliance Test <br />Name of Local Agency Inspector {if present during testing): <br />Manufacturer Trainin <br />Manufacturer Com gonent(s) DateTraining Expire <br />Available upon request H <br />Component: <br />87 Tank Annular <br />91 Tank Annular <br />87 Secondary Product <br />91 Secondary Product <br />87 Turbine Sump <br />91 Turbine Sump <br />UDC 1/2 <br />UDC 3/4 <br />UDC 516 <br />UDC 7/8 <br />87 Fill Bucket <br />91 Fill Bucket <br />87 Vapor Bucket <br />91 Vapor Bucket <br />Component: Pass Fail Not Repairs <br />Tested Made � <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Used pump test truck <br />
The URL can be used to link to this page
Your browser does not support the video tag.