My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />FEB 0 3 2017 <br />4. TANK ANNULAR TESTING ITW <br />Test Method Developed By: 0 Tank Manufacturer 0 Industry Standard LTroe <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum 7 Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: Test plugs, venturi pump and gauges <br />Equipment Resolution: -.0.5% of span <br />Tank # 87 <br />Tank # 91 <br />ISTank Exempt From Testine <br />0 Yes ®No <br />Ta Capacity: <br />l4k <br />14k <br />Tank Material: <br />Fiberglass <br />Fiberglass <br />Tank Manufacturer: <br />Owens Coming <br />Owens Coming <br />Product Stored: <br />Gasoline <br />Gasoline <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min <br />10 min <br />Test Start Time: <br />6:45 am <br />7:00 am <br />Initial Reading (Rt): <br />7" hg <br />7 hg" <br />Test End Time: <br />7:45 am <br />8:00 am <br />Final Reading (RF): <br />7 hg" <br />7 hg" <br />'rest Duration: <br />I hour <br />I hour <br />Change in Reading (RF -R,): <br />None <br />None <br />Pass/Fail Threshold or Criteria: <br />No Detectable Loss <br />No Detectable Loss <br />Test Result: <br />El Pass E, Fail <br />[HI Pass 0 Fail <br />Was sensor removed for testing? <br />ZYes ONo [INA <br />0 Yes El No D NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />0 Yes 0 No 0 NA <br />0 Yes D No El NA <br />Comments — (include information on repairs made prior to testing, and t-ecolitniended,fblloiv-tip.for.failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br />testing. {California Code of Regulations, Title 23, Section 2637(a)(6)1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.