Laserfiche WebLink
SWR6,January 2002 Page S Of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 'Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ressure 0 Vacuum 0 Hydrostatic <br /> rOcOther(Sped) <br /> Test Equipment Used:?(,e-SS(014 VS-XA Q SE` Equipment Resolution: <br /> Piping Run# -Z— -3 \Piping Run# <br /> Piping Run#L Piping Run# <br /> Piping Material: I ees 5 v e,S 1 = e.s S <br /> Piping Manufacturer: <br /> Piping Diameter: 3 <br /> Length of Piping Run: ro Y. Al))qfd-y" lu /0 YO.V., <br /> Product Stored: C ee <br /> Method and location of + <br /> piping-run isolation: 3 <br /> Wai i between applying <br /> pressure/ <br /> test:pressure/ cuum/water and <br /> g <br /> S 0 t.,V- L�o <br /> Test Start Time: 3 0 q= 3 C3 3 6 <br /> Initial Reading(R,): P5--r- 5 F5_" tr P5-r- <br /> Test <br /> 5-r- <br /> Test End Time: v tt- 30 30 <br /> Final Reading(RF): 15. P5 P3--& P5 r' <br /> Test Duration: 2, 1-,,it 1--ouivs Lief u V, <br /> Change in Reading(RF-R,): (::t) lo4S T d) 1 5 = pas- <br /> Pass/Fail Threshold or <br /> Criteria: MbJz4Ao6tz-[oj5 I r,30 J��If4a We I On L-�e.�(-4 le. <br /> TestResult: Pass 0 ail a Pass 0 Fail Pass o Fail o pass n Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />