Laserfiche WebLink
S WRCB,January 2002 Page Lf of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard V16fessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure (=}Vacuum hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 6(c_W-G Equipment Resolution: ,o o 2,_ <br /> Sump# -T— Sump# Z Sump# 3 sump# <br /> Sump Diameter: <br /> Sump Depth: L/ /)V ) <br /> Sump Material: ; 12e re, F1)2,e e e,lee sIIPo— o.x'"3r 1. <br /> Height from Tank Top to Top of �3°" ? e, 2Z'/ {pav' 2_3t, c <br /> Highest Piping Penetration: &' X10J0z„d.., j?" I Pt4)Viect+ 2A koge"..t �- <br /> Height from Tank Top to Lowest / 1 o r f] <br /> Electrical Penetration: I(,,, r 1 � b i <br /> Condition of sump prior to testing: QY 'Ory 0 v <br /> Portion of Sump Tested' kact-1- V "'(c -5" t,)-c4,—L&4 c ?_51, U 4cv c-zg <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothes ❑No ❑NA }f'es ❑No ❑NA es ❑No ❑NA ❑Y ❑Ni ❑NA <br /> product and water)? G`� <br /> Turbine shutdown response time gJ,4- CW*,t.t(Q -(t t C,1 M,�, <br /> Is system programmed for fail-safe <br /> shutdown?` Yes ❑No ❑NA "es ❑No ❑NA r16Yes ❑No ❑NA ❑Yes No ❑NA <br /> Was fail-safe verified to be ❑yes No ❑NA ❑Yes ❑NA ❑Yes o ❑NA ❑Yes No ❑NA <br /> operational?* <br /> fi <br /> Wait time between alying <br /> pressure/vacuum/ ater d starting <br /> test: to t i T ti u 4--r S i p m-.�'us ut� _r S E p t'Pt>"n cA S <br /> Test Start Time: 1- S` 8: 3 <br /> Initial Reading(Rj): rlwl cele jrrxs-k ctYc4" i C �e <br /> Test End Time: ]c� ! T u- A: Uv <br /> Final Reading(RF): rrv&-� CG,VCQ °t --rrvs I cr, %#Q <br /> Test Duration: -�-e S 7()r`11 1,4 "0✓l t,_kt 1'4-,-e t <br /> Change in Reading(RF-R,): IJ v C(,,,r,,,, tj o v ti�C <br /> Pass/Fail Threshold or Criteria: , 0 0M r1_1 . 40 6 S" 3d rr° .00 s' 30 roc <br /> Test Result: UY Pass ❑Fail Pass ❑Fail. Pass ❑Fail ❑ Pass ❑ Fa't <br /> Was sensor removed for testing? Aryes ❑No ❑NA kes ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑ <br /> Was sensor properly replaced and yes ❑No ❑NA i 'es ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />