Laserfiche WebLink
SAN JOAQ�COUNTY ENVIRONMENTAL HEAL PARTMENT <br /> UNDERGROUND STORAGE TANK Now <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION M°1. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ C� 1 0 1 L �, I � 1-1 1 <br /> J <br /> FACILITY NAME 1" �.� M03. <br /> FACILITY SITE ADDRESS �a�] ,. f, �1 4,r M04 CITY L�z?� Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed m We, <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personrei. <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY ❑ 99.OTHER(Specify): MOS <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form.Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this pian. <br /> IV. TANKMONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M1o. <br /> [ 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUL�t <br /> PANEL MANUFACTURER: i iv M12. MODEL#: `%S 1c- M13. <br /> LEAK SENSOR MANUFACTURER: ,^ C%`t' M14. MODEL#(S): M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: M" MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY MCO. <br /> d.MONTHLY ❑ e.OTHER(Specify): <br /> X121. <br /> PROGRAMMED TESTS: ❑ a.0.1 n.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23 <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR•2 646 ❑ b.STATISTICAL PER 23 CCR§2646 1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§§'2645 <br /> TESTING PERIOD: '_5. <br /> ❑ a.36 HOURS ❑ b.60 HOURS M <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ti126. M_;. <br /> Q a.ANNUALLY b.BIENNIALLY c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ <br /> 99.OTHER(Specify): M2s. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> E�_I.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMPS)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: 0 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d:UNDER VACUUM 1131' <br /> PANEL MANUFACTURER: 1 +,v e✓0- M32- MODEL#: 1_S M33. <br /> LEAK SENSOR MANUFACTURER: (y�ctn^ 1134. MODEL#(S): M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? Era.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a a.YES ❑ b.NO M37. <br /> (� 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 &p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK ISE C w <br /> MLLD MANUFACTURER o ^ Z <br /> (s): !� Mag. MODEL#(S): M39. <br /> ��"� A <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0&p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: "'' <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2&p.h. ❑ b.MNNUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO 1,143. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? M44. <br /> ❑ a.YES ❑ b.NO <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. Mos. <br /> ❑ 5.VISUAL MONITORNG DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MN.MONTHLY&EACH TLYIE SYSTEM OPERATED- M47. <br /> •Requires agency approval ••Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25231.5(bx3) <br /> 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23(,.'( R§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> [399.OTHER(Specify) Mas. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />