My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:39:04 PM
Creation date
6/3/2020 9:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e SAM JOAQ1W COUNTY ENN RONMENT.0 HE ALT PART' <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE iN MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moe. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWNG UST SYSTEM(S): <br /> FACILITY ID#(Agency UI. FACILITY INFORMATION Only) I , 1 _ � <br /> FACILITY NAME -4---v Moa. <br /> FACILITY SITE ADDRESSM°4 { CITY Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE INUUNTENAINCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment i,e.g.,sensors,probes,line leak detectors,etc.)be performed in Moa. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work musr be performed by quaiii1ed personnei. <br /> MONITORING EQUIPMENT IS SERVICED ® I.AN`IUALLY El 99.OTHER(Specify): Mol <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g..current UST Monitoring Site Plan from a Monitoring System Cerflcan <br /> form,Hazardous Materials Business Plan map.etc.)which shows all recluired information,include it with;his Dian. on <br /> IV. TAlYX-MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWNG NIETHOD(S):(Check all that apply) Mlo. <br /> [�. I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: © a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUU�1 Mi 1. <br /> PANEL MANUFACTURER: j�`"��>^ "12 MODEL, %) /C- M13. <br /> LEAK SENSOR MANUFACTURER: 7 C'=-ti M1.4 MODEL=(S): uls. <br /> F-12.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: Mih, MODEL.: MIT <br /> IN-TANK PROBE MANUFACTURER: Ni 13, MODEL-(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY,,-NIGHTLY ❑ C.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 a.p.h. <br /> ❑ c.OTi:ER(Specify): M"-. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR 2E46 71 .STAT!S71CAL PER_-3 CCR§2646 I M-� <br /> El 4.WEEKLY MANUAL TANK GAUGING(MTCG)PER 23 CCR§§'2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§§'2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY <br /> ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M2T <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires azency approval) <br /> ❑ 99.OTHER(Specify): vf2s <br /> V. PIPE MONITMING <br /> MONITORING IS PERFORMED USING THE FOLLOWNG METHOD(S)(Check all that apply) M30. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AN D OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: G a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE �❑ d.UNDER VACUUM Mat. <br /> PANEL MANUFACTURER: 1 yi co- M32. <br /> .MODEL4: M33. <br /> LEAK SENSOR MANUFACTURER: l K Ctn^ M34 MODEL..=(S): M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? Era.YES ❑ b.NO "36 <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑T a.YES ❑ b.NO M37. <br /> I� 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS ERCT; _ <br /> MLLD MANUFACTURER(s): _ IA I M33. MODEL#(S): , l P � LIZ 1\439. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: sup. MODEL •.u+ <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MNLINtUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDO`vVN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURFJDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ e.OTHER(Specify) M45. Mas. <br /> ❑ 5.VISUAL MONITORNG DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- M47. <br /> *Requires agency approval -Allowed for monitoring cf unburied emergrney gcne..ator fuel piping only per HSC;25231.5(6x3) <br /> ❑ 6.PIPING 1S SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) <br /> SJCEHD-d(07/03)-1/4 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.