Laserfiche WebLink
0 <br /> UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED OPERATOR FACILITY EMPLOYEE 1 RECORD <br /> For use by Unidpes Member Agencies or where approved by your Local Jurisdiction <br /> Authority Cited: Title 21, Div. 3, C& 16 California Co&of Regulations(CCR) <br /> Facility Name: <br /> U <br /> Facility Site Add ;L5 L L-o city: <br /> Section 2715 of ride 23, California Code of Regulations, requires that Designated Underground Storage Tank operators <br /> provide training to facility employees who have responsibilities associated with the operation wid/or maintenance of <br /> undeWound stomp tank(UST)systems, This training must be provided by July 1,2005, and,every 12 months dwirafter. <br /> For facility employ ces hired after July 1, 2005, the initial training must be provided within 30 days of the date of hire. At <br /> least one of the facility employees present during operating hours must have current training.This training must include,but <br /> is not limited to,the following itorns as specified in 23 CCR Sections 2715(f)(1)and(2): <br /> 0 Operation of the UST system in a manner consistent-with the facility's Best Management Practices; <br /> 13 The employee's role with regard to UST monitoring equipment as specified in the wvitten UST Monitoring Plan-, <br /> 0 The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br /> 0 Name(s)of contact person(s)for emergencies and monitoring equipment alarms; <br /> 0 <br /> For facilities that am nae routinely staffed,facility employee responsibilities as specified in the training prug:ram <br /> approved by the local UST regulatory agency. <br /> 23 CCR§21715(f)(3)requires that a list of employees who have been trvimW by the Designated Underground storage TV* <br /> Opemtors)be maintained on-site,or off-site ata readily-available location and provided to <br /> the local agency upon request COmPleftOrk Of this f0m will satisfy UST training recmd keeping requirements.The following <br /> employees leave been trained as required by 11 CCR Sections 2715(f)(1)and(2): <br /> Facil Em 10)I ce Name Date Hire t-e <br /> I - air NaN <br /> the <br /> ft <br /> Z& F <br /> L <br /> LQv" C�UT e, <br /> Lf I QL Af. r 4 <br /> Wo"Med on revene) iONIV4E A L <br /> HEALTH DEPARTM <br /> If hired aftr My 1,2005 <br /> Trwna must beg CWeM Designated UST Opera for the facility at the time of tmirLng. <br /> 07/13M <br />