Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Page of <br />5. SECONDARY PIPE TESTING <br />❑ Piping Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: PRESSURE GAUGE <br />Piping Run # 1 <br />Piping Run # 2 <br />Equipment Resolution: 0 <br />Piping Run # 3 Piping Run # <br />Piping Material: <br />F/G <br />F/G <br />F/G <br />Piping Manufacturer: <br />WESTERN FIBER <br />WESTERN FIBER <br />WESTERN FIBER <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />100' <br />90' <br />100' <br />Product Stored: <br />87 <br />91 <br />DSL <br />Method and location of <br />piping -run isolation: <br />BOOT IN SUMP <br />BOOT IN SUMP <br />BOOT IN SUMP <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MIN <br />5 MIN <br />5 MIN <br />Test Start Time: <br />10:20 <br />10:20 <br />10:20 <br />Initial Reading (R,): <br />5 PSI <br />5 PSI <br />5 PSI 1 <br />Test End Time: <br />11:20 <br />11:20 <br />11:20 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF -R,): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />