My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:56:06 PM
Creation date
6/3/2020 9:48:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSEMBLING THE COMPONENTS [cont'd] _ TESTING THE PERSTITIAL SPACE <br /> E) After all piping connections A) Install the Omniflex test <br /> are made, and not before, fas- boots (CS2019) in the proper <br /> • ten the impact valves with the position.Make sure the stain- <br /> appropriate riser and fitting less steel clamps are located <br /> into the designated dispenser over both the secondary layer <br /> sumps.Do not make final con- and the coupling ferrule. The <br /> nection to stabilizer bar until flow nipple on the test boot <br /> all piping connections are made. should be centered over the <br /> gap between the coupling and <br /> F) Connect the single adaptor the secondary layer. Tighten <br /> (SA4000)or Y adaptor(DA4000) the stainless steel clamps to 30 <br /> into the 2"female ball valve at inch pounds. <br /> the submersible pump.The ball <br /> valve allows isolation of the line B) Insert the barbed ends of <br /> during pressure testing, but is the nylon flow tube kit(FT1150) <br /> optional. into the flow nipple on the in- <br /> stalled test boots (CS2019). <br /> G) Push the coupled ends of Tighten the stainless steel <br /> pipe through the FB/CB2030 clamps to 30 inch pounds. <br /> bulkhead fittings. Before at- <br /> taching the couplings in the tank <br /> sumps and dispenser sumps, C) Insert the barbed end of <br /> place a CS2019 test boot onto the nylon test tube kit(FT1 151) <br /> each end of the pipe. The test into the opening on the in- <br /> boots enable pressure testing of stalled test boots (CS2019) in <br /> the interstitial space (see Test- the termination dispenser <br /> ing Interstitial Space below). sumps and tank sumps. Tight <br /> the stainless steel clamps to 30 <br /> • H) Place a new copper washer inch pounds. <br /> on the cone seat of the male <br /> fitting. First, apply lubricant D) Close valves on end of nylon <br /> ti (non-granular)to the inner sur- test tube kits (FT1151) located <br /> face of the copper washer to aid on termination dispenser sumps. <br /> in keeping the copper washer Connect air line to nylon test <br /> aligned.Thread the female cou- tube kits in tank sumps and test <br /> pling into the male fitting using interstitial space to 5 psi. <br /> between 60 and 100 foot pounds <br /> of torque. Do not use joint com- <br /> pound on threads of fitting. <br /> BACKFILLING <br /> I) Place a cap on the shear <br /> valve. Open the poppet valve When backfilling Omniflex be <br /> (as shown), make sure ball 6` sure to space lines 4"apart and <br /> valve in step F is closed, and r a° 6"from the trench walls.Avoid <br /> test the primary to 60 psi.HoldO O O direct dumping.Maintain 1/8" <br /> for at least one hour.Allow the slope (minimum) on all lines. <br /> pipe to stabilize under pres- Note:Many local codes require all <br /> sure approximately 15 min- lines to maintain air pressure dur- <br /> utes.(Consult local codes,their ing backfilling. <br /> requirements may vary.) <br /> Page 4 - Omniflex Instructions <br />
The URL can be used to link to this page
Your browser does not support the video tag.