My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:56:06 PM
Creation date
6/3/2020 9:48:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSEMBLING THE PRIMARY cont'd) B) Pressurize the primary pipe <br /> to 60 psi (or that which is re- <br /> quired by local code). Allow <br /> C) Place the primary coupling the pipe to stabilize underpres- <br /> nto the mae mandrel <br /> the primary pipe sure approximately 15 minutes. <br /> onto the of the cou- Examine the gauge for any loss <br /> pling machine (CM1525). The in pressure which may indi- <br /> coupling should push onto the cate leakage in the assembly. <br /> shoulder and butt against the <br /> stop. Turn on the machine. C) After completing the pressure test,if there is a loss of <br /> Move the handle to the A port pressure,remove the test plug from the female fitting,look <br /> and push the peddle down un- for a misaligned washer,and try assembly sequence again. <br /> til you see the light go on or If pressure is lost again,cut off the coupling and recouple. <br /> hear the buzzer go off. After Note:After successful completion of the pressure test, re- <br /> the light or buzzer signals that move the test plug and copper washer.Copper washers can <br /> the expansion is complete, re- be reused for all pressure tests. <br /> lease the peddle and move <br /> handle to B port. Press peddle A NEW COPPER WASHER MUST BE USED FOR FINAL CONNECTION. <br /> down until coupled pipe can be <br /> removed from mandrel. Note: <br /> Make sure to hold the pipe ASSEMBLING THE PIPING COMPONENTS <br /> steady and straight (18') until <br /> coupling process is complete. A) Secure the 1-1/2"riser pipe <br /> D) Pull the coupling and pipe <br /> in a vise and coat the length of <br /> the threads thoroughly with <br /> assembly off the machine and product compatible pipe joint <br /> visually inspect the coupling compound. Pipe threads must <br /> for misalignment or damage. <br /> (Use a flashlight to illuminate be a maximum of 1"; longer <br /> the interior of the coupling if threads may result in the pipe <br /> necessary.) <br /> not sealing in the fitting. <br /> B) Thread the appropriate fit- • <br /> PRESSURE TESTING THE PRIMARY ting (tee, TE1500, or so', <br /> EL1500)onto the riser pipe and <br /> Pressure testing the primary pipe involves two procedures. tighten until a seal is obtained. <br /> The first procedure is to test each run of pipe individually <br /> before installation (should be done at this point). The <br /> second procedure is to test the primary pipe after the entire <br /> system is connected. <br /> C) On the opposing end of the <br /> Step One—Pressure Testing the Couplings - riser pipe,coat the threads with <br /> _ pipe joint compound. Thread <br /> A) Apply lubricant (non- on the impact valve and tighten <br /> granular,Moly Kote G or any until a seal is obtained. Make <br /> clean grease)to the inner sur- sure the impact valve mount- <br /> face of the copper washer, ing holes are parallel with the <br /> WS1000,to aid in keeping the fitting inlets. Note: Use boss <br /> copper washer aligned. Place <br /> PP g mount impact valves, U-bolts <br /> the copper washer on the cone cannot be used for mounting to <br /> seat of the test plug. Thread TCI dispenser sumps. <br /> the test plug(PA1500)into the <br /> coupling making sure the cop- <br /> D) Assemble the brackets i <br /> per washer is aligned correctly. °r. from the impact valve mount- <br /> Tighten the plug sufficiently ing bar onto the boss mount <br /> to deform the copper washer impact valves. , <br /> (use between 60 and 100 foot <br /> pounds of torque). <br /> • <br /> Page 3 -Omniflex Instructions <br />
The URL can be used to link to this page
Your browser does not support the video tag.