Laserfiche WebLink
UNDERGROL_ STOR4GE TANK MONITORLNG SYSTEOERTM, 121 TIO'-N- <br /> T <br /> Z. Ir--Vann Caugin. 11 SIR Fauip�eut Pe-mit Number <br /> Checl,this bon_if tan,:gau�*ing is used oniv for inventory contro' <br /> ❑ Check this box if no tan,:gauping or Sff,eauininstalled <br /> This section must be co=1cted i:.rin-taxi: ,auainZ--Ouimmmt is used to pen'TO leak detection monitoTinrt. <br /> complete the foliowirg checklist: <br /> Q Yes ❑ No* Has alt input vnring been inspekted for proper entry and termination;including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank ganging probes isually inspected for damage and residue buildup" <br /> Yes ❑ No* Was accuracy of system produc level reaaings tested? <br /> Yes I ❑ No Was accuracy of system water level eadings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* ( Were all items on the equipment manufacturer's�tenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were o)are <br /> l be corrected. <br /> C. Line Leek Detectors (LSD): Z] Check this box if LLDs of instaIled. <br /> Compet the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certifica on, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check all that apply) Simulated leak rate: ❑3 g.p.h ❑ 0.1 g.p.h. ; ❑ 0.2 g.p.h. <br /> i <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate thin regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does.the LLD restrict pro uct flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine auto ma ally shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? d <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine autorr atically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually,inspected? <br /> ❑ NIA <br /> ❑ Yes ❑ No Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section R below,-describe-how and when these deficiencies were or will be corrected. <br /> H. Coicftments• <br /> 'I <br /> DEMHKL 9301,(Rey O8/02) •Page 3 of 4 -County of Sart Diego-DEB[-Hazardous Materials Division. <br />