My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 4:11:28 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM — Executive 01 10 VR -201 -D and VR -202-D (CAS — 9961) Page 21 <br />INSTALLATION INSTRUCTIONS for <br />HEALY SYSTEMS, INC. <br />CLEAN AIR SEPARATOR <br />The Model 9961 or 9961 H, Healy Systems Clean Air Separator (CAS) consists of a 400 gallon steel <br />vapor processor vessel that contains a fuel resistant bladder to hold excess gasoline vapors that may <br />develop in gasoline storage tanks during idle periods of gasoline dispensing facility operation. Models <br />and Drawings with a "H" suffix apply to horizontal CAS installations and those without a "H" suffix apply <br />to vertical CAS installations. The CAS assembly weighs approximately 800 pounds which makes it <br />necessary to have a power assisted lifting device available at the installation site to remove the CAS <br />from the transportation vehicle and place it on the required concrete pad (see drawing 9900-9945 <br />or 9900-9945H). The pad (level within 1/8"/foot) is located within 100 feet to the gasoline storage <br />tank vent lines. The pad is a requirement of this installation. DO NOT PLACE THE CLEAN AIR <br />SEPARATOR DIRECTLY ON THE GROUND OR ASPHALT SURFACE. NOTICE: The installer is <br />responsible to ensure that the installation meets the latest edition requirements of NFPA 30A, Chapter <br />10. No electrical connections are required. The CAS securement method shown in drawing 9900-9945 <br />or 9900-9945H shall be approved by the local authority having jurisdiction with respect to wind and <br />seismic loading. Installer shall not loosen, rotate or remove factory installed fittings or flange as this <br />may damage factory seals and void warranty. <br />In addition to the vapor processor vessel, there is a hardware kit that contains the following: <br />4 Locking 1" NPT Ball Valves <br />4 Pad locks (keyed alike) <br />1 Breather Assembly, Healy Model 9948 <br />1 Float Check Valve Assembly, Model 9466G <br />Reference the appropriate Healy Systems installation drawing (9900-9942, 9900-9942H, 9900-9971, <br />9900-9971 H, 9900-9972, 9900-9972H, 9900-9973 or 9900-9973H of this manual) for placement of the <br />above parts for the vent stack configuration required by the local Authority Having Jurisdiction (AHJ) <br />for the Underground Storage Tank (UST) system. The local contractor is responsible to provide all <br />necessary, galvanized piping, non -hardening, UL classified pipe joint compound and plumbing fittings. <br />Additional Pressure/Vacuum (PN) vent valves to complete installation are not included in the hardware <br />kit. Healy is not responsible for the warranty of any other PN vent valve purchased to complete <br />installation. <br />The CAS arrives at the site assembled and tested. All plumbing shall be done using 1" galvanized <br />steel pipe (Schedule 40) and approved nipples, as called out in the installation drawing appropriate for <br />the site installation. Mounting hardware shall be galvanized or stainless steel. Careful attention must <br />be paid to the installation drawing appropriate for the site installation to assure proper operation of the <br />bladder system. Do not inflate the bladder assembly after installation. <br />It is important that the CAS be secured to the concrete pad as shown in drawing 9900-9945 or <br />9900-9945H of this manual to prevent any unintentional repositioning of the CAS as the connecting <br />plumbing to the vent system is accomplished. <br />Franklin Fueling Systems <br />3760 Marsh Road <br />Madison, Wisconsin 53718 USA <br />ARB Approved Installation, Operation and Maintenance Manual <br />Website: hftp://www.franklinfuelina.com <br />Email: sales@franklinfueling.com <br />Telephone: 800-225-9787 <br />Fax: 608-838-6433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.