My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:53:46 PM
Creation date
6/3/2020 9:48:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Address:3425 TRACY BLVD TRACY 953761722 Service Date:01/09/2009 <br /> F. In-Tank Gauging/SIR Equipment Check this box if tank gauging is used only for inventory control <br /> ❑Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the f6o owina checklist <br /> ®Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground <br /> faults? <br /> ®Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑No* Was accuracy of system product level readings tested? <br /> ®Yes ❑No* Was accuracy of system water level readings tested? <br /> ®Yes ❑No* Were all probes reinstalled properly? <br /> ®Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLDs are not installed <br /> Complete the 1160 owing checklist <br /> ®Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑N/A Simulated Leak Rate(check all that apply) 03.0 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> ®Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or fails a test? <br /> ❑N/A <br /> ®Yes ❑No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ®Yes ❑No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> The monitoring system is operational at this time therefore no ground faults are present. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.