Laserfiche WebLink
Monitoring System Certification <br /> Address:3425 TRACY BLVD TRACY 953761722 Service Date:01/09/2009 <br /> UST monitoring Site Plan <br /> . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> ...may . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1 . . C4. ( . . . . . . . . . . . , <br /> 1l4.g® . . . . . . . . . . . . ? . . .� 4. . . . . . . . . . . . <br /> . . . . . . . . . . . . v&A/v . CID . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . .. . . . . . . . . . . . ,a� y. . . .'t i . <br /> . . . . . . . . . . . . <br /> .w�t•'v . . . . I . . . . . . . . . . . . . . . . . . . . . . . . <br /> .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . .a. ® . .®. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 10 <br /> v ® ® . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 0 <br /> . . . . . . . L'!. t;s� . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . .. . . . <br /> . . . . . . . . . . . . A7 . . . .v+ . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Li <br /> Date map was drawn:01/09/2009 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it, rather than this page, <br /> with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment <br /> areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). <br /> In the space provided, note the date this Site Plan was inspected. <br /> Page 4 of 4 <br />