My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-1rro <br />C0 <br />GR Job # 20-602708 <br />or <br />FAIL (Next Day Repair Required) <br />nature ay <br />is objective of this test is to provide assurance that the when the E p svA 1. activated, all the fueling system circuits (turbines, and dispensers) are de -energized, <br />main de -energized until they are reset manually). The test procedures and guidelines shall be in accordance with the E -Stop Testing Process. <br />X To S®bd <br /># The following dnformatfon Is to be compfeted <br />Ya No <br />1 I Number of E-Sto switches: <br />2 Type of Switch? Push Pull _ Momentary X Plain light / Toggle _ Other: <br />(if Momentary type, locate and identify reset button): In Elect Room <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />Brown Box X Power Solution i Other —Custom Fabricated <br />Of <br />Mechanical <br />6 Does the E -Stop shutdown power to the DISPENSERS x <br />7 Does the E -Stop shutdown power to the TURBINES x <br />F11 <br />Is the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? x <br />Are the DISPENSER BREAKERS clearly identified / labeled? X <br />Are the TURBINE BREAKERS clearly identified / labeled? x <br />ArealltheESOs accessible and clearly identified / labeled? x <br />Did the ESO(s) function correctly (de -energized from either the line side or the motor side of the contacts or the coli)? x <br />12A If #12 is NO, briefly describe what was wrong: <br />How was it corrected: <br />12C If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify the E <br />Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locate circuit <br />panel , clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />12D ( Elite Customer Solution Center has been contacted for the repair. <br />feMaint. W.O. Ticket # <br />iystem is fully operational. <br />secured and any access ports, lids, enclosures are closed. <br />cades. and anv debris was been removed. <br />completed copy with other documentation in E -Maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.