My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_1985-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 2:28:53 PM
Creation date
6/3/2020 9:48:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1996
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
YOSEMITE PETROLEUM
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231426_2072 W YOSEMITE_1985-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE XLD...3 STEP L&K TEST <br />The Red Jacket leak. detector is a pressure <br />sensing, diaphragm operated valve designed <br />to indicate a leak in the piping between the <br />leak detector and dispenser. <br />When the submerged pump is turned on, a <br />controlled amount of product (three gallons <br />per hour) is metered through the leakdetector <br />into the piping system. If a leak is present <br />LESS THAN 1 PSI <br />E <br />I <br />THE "TRIP" OR RELAXED POSITION. <br />Under normal operating conditions, it is <br />assumed that the lines are filled with gaso- <br />line. When the system pressure is less than <br />1 psi, the diaphragm and poppet are in their <br />"down" or "tripped" position. The position of <br />the valve "poppet' is such as to allow ap- <br />proximately 1-1/2 to 3 gpm flow into the <br />delivery line, through a bypass opening in <br />the leak detector valve poppet, when the <br />submersible pump starts. Sincethesystem <br />is full, pressure builds up rapidly and the <br />poppet moves to the leak sensing position <br />assuming there is no leak present. <br />LEAK SENSING POSITION. As the pres- <br />sure builds to approximately 8 to 10 psi <br />(rapidly), the diaphragm has moved the <br />which equals or exceeds this amount, as <br />much product escapes from the system as is <br />metered in through the leak detector. Under <br />this condition pressure cannot build up in the <br />piping system. When a nozzle is opened, a <br />poppet in the leak detector moves to a posi- <br />tion which restricts the flow to approximately <br />1-1/2 - 3 GPM. This is the indication to the <br />E <br />I <br />poppet to such a position as to almost stop <br />the flow into the piping through the leak <br />detector valve poppet. In this position, all <br />the flow must travel around the metering <br />pin which limits it to approximately 3 gph <br />rate. If a simultaneous loss from the sys- <br />tem equals or exceeds this amount, the <br />line pressure will not build beyond this <br />point and the valve will remain in the leak <br />sensing positionwiththe main flow blocked. <br />If there is an attempt to dispense while the <br />valve is in position, the line pressure will <br />drop, the diaphragm will respond, and the <br />poppet will return to position 1 where 1 -1 / <br />2 to 3 gpm will flow to the dispensers. <br />Leaks smaller than 3 gpm will be indicated <br />by the Leak Detector taking longer than <br />• <br />operator that the leak is present. <br />If there are no leaks, pressure rapidly builds <br />in the system forcing the leak detector to <br />open to the full -flow position. Ina system with <br />no leaks it takes approximately two seconds <br />for the complete test. No further line testing <br />takes place until the line pressure drops <br />below 1 PSI. <br />POSITION 3 <br />FULL PRESSURE <br />APSI <br />FROM • <br />FROM PUMP <br />approximately two seconds to open <br />completely. If there is no leakage in the <br />system, the small flow around the meter- <br />ing pin increases the line pressure to 10 <br />psi in approximately two seconds at which <br />point the diaphragm will snap the poppet <br />to position 3. This all takes place in less <br />time than it takes to reset the dispenser, <br />walk to the car, remove the gas tank cap, <br />insert and open the nozzle. <br />3. NON -LEAK POSITION This position al- <br />lows full flow. The poppet will remain in <br />this position as long as the system pres- <br />sure remains above 1 psi. At less than 1 <br />psi the poppet will return to position 1 and <br />the next time the pump is activated, the <br />Leak Detector will perform a line test. <br />This product is designed and sold to detect leaks of approximately 3GPH or greater only. For leaks <br />of less than approximately 3GPH, please consult with your Marley Pump Company representative. <br />MARLEY <br />T.I. ARLEY PUMP COMPANY <br />#5171116/91 10 <br />A oi,s,o, of Ma,leY Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.