Laserfiche WebLink
SWRCB,January 2002 • • <br /> Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: %fiping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specie) <br /> Test Equipment Used: 1�r,e5su,re Gau e-5�� �S�- 1J1 vv PI Equipment Resolution: <br /> Piping Run#1 Piping Run#2 Piping Run# 3 Piping Run# <br /> Piping Material: F, <br /> Piping Manufacturer: 1�v»�°rvr'1 rd rt�,��ara <br /> Piping Diameter: <br /> Length of Piping Run: r�X, (� () i DD ' <br /> Product Stored: i u 01 !-rSjp-L- <br /> Method and location of jw-f beef- - . <br /> i in -run isolation: Zrp �G6.iw,0 � t: <br /> - <br /> Wait time between applying j <br /> r s vacuum/water and <br /> startin test: o ,� -r <br /> Test Start Time: <br /> Initial Reading(R): 57 5;L s /J S x S n SS <br /> Test End Time: --3130 9 "30 9 3 O <br /> Final Reading(110: S P5-T 5 P5-T5p s i p s s <br /> Test Duration: v <br /> Change in Reading(RF-Ri): P 5:tS� S-17 <br /> Pass/Fail Threshold or <br /> Criteria: ivd Loss -,Yn Ps s r`td to5S ?0 Psx Ado 1-645 rv? /QST <br /> Test Result: Pass ❑Fail Pass ❑ Fail VPass ❑Fall ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />