Laserfiche WebLink
S WRCB,January'2002 Page q of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure ❑Vacuum )iydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Oall W e Z1 kmelt Cj E o co,4vv" Equipment Resolution: A b p C;�-- <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: , ,v c s LA S <br /> Height from Tank Top to Top of %`udu c f ?7" S,.J pr cla c-f-/4 " <br /> Highest Piping Penetration: v dY ;z&'' .21" <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: f' 5 r 1 S '/ <br /> Condition of sump prior to testing: ';Y ,0 y y <br /> Portion of Sump Tested' W-I LY L.W zl" w2 4evL, -7 r .wa 4-eV bkt s <br /> Does turbine shut down when <br /> sump sensor detects liquid(both YYes ❑No ❑NA )i'es ❑No ❑NA �Yes ❑No ❑NA ❑YesVO <br /> ❑NA <br /> roduct and water)?' <br /> Turbine shutdown response time N M aywe8 f,�-�tlar�eee�} w, ../ <br /> Is system programmed for fail-safe Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑Yes )in-No ❑NA ❑Yes Ao ❑NA ❑Yes "o ❑NA ❑Yes N ❑NA <br /> o rational?° <br /> Wait time between�Ilymg <br /> pressure/vacuu water d starting <br /> test: l 0 wV wu�-G S i C b <br /> Test Start Time: , <br /> Initial Reading(Rj): D o ( " 001 1 00 <br /> Test End Time: o rat 5- <br /> Final Reading(RF): 00 i <br /> Test Duration: <br /> 30 v K"145 Ec 3 O f <br /> Change in Reading(RF-Rj): <br /> Klb <br /> Pass/Fail Threshold or Criteria: ,ddb" i b 30 a a► <br /> Test Result: Pass ❑Fall Pass ❑Fail Pass ❑ Fail ❑ Pass ❑Fai <br /> Was sensor removed for testing? Wes ❑No ❑NA Om ❑No ❑NA XYes ❑No ❑NA ❑Yes ❑No ❑N <br /> Was sensor properly replaced and A Yes 0 No ❑NA WYes ❑No ❑NAJ )eYes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended oHow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to 4ay of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />