My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 ® Page sof <br /> 7. UNDER-DISPENSER CONTAUGIENT QMQ TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry StandardFrofessional Engineer <br /> 0 Other(Spec6) <br /> Test Method Used: 0 Pressure ❑Vacuum ydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: C•Ct toe 1 �, (� �t m4V-(' Equipment Resolution: , O0 Z <br /> UDC# 4-2= UDC# UDC# UDC# Z Le <br /> UDC Manufacturer: r��/0 3+-�wO rrco �r v <br /> UDC Material: S *,. S <br /> UDC Depth: to -t •• <br /> Height from UDC Bottom to Top <br /> of Highest Pi in Penetration: C 5 C e�n e w. e- G -W <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: 5ee coy,,.,,c--vAS 5-e,t 1M �® <br /> Condition of UDC prior to <br /> tes ' <br /> Portion of UDC Tested ^ " lcvlelk G <br /> Does turbine shut down when �i <br /> UDC sensor detects liquid(bath D Yes D No XNA 0 Yes 0 No XNA' D Yes D No )TTA 0 Yes 0 No �NA <br /> product and water?° <br /> Turbine shutdown reTonse time M IA- it lit htl ARW7 <br /> Is,system programmed for fail- <br /> safe shutdown?` 0 Yes D No )(NA 0 Yes 0 No 9NA ❑Yes ❑No %NA ❑Yes ❑No I NA <br /> Was fail-safe verified to be <br /> operational?° D Yes 0 No XNA 0 Yes D No ANA 0 Yes D No VNA D Yes ❑No KNA <br /> Wait time between lying <br /> pressure/vacu orate and f! (� <br /> startin test D vacs% B IM1..td, .a (, f V gt..Bi''G fGs+ <br /> Test Start Time: <br /> Initial Readin ov 1 40/ <br /> Test End Time: 8sq r 3 6 f!w Y6 <br /> Final cod/ 1 d o cu <br /> Test Duration: M W+f 5 3 d P1 m� '• S ie+�e + S 3 D,r� M S <br /> Chane in Readin &:U: <br /> Pass/Fail Threshold or Criteria: ,d o s 3 o A 4 T L c Ua S" 16i" •uv tJw+n.. l �- <br /> T'estResult: :Pass 0 Fith` Pass ❑Fail Pass D Fhil bass Cl`FAR. <br /> Was sensor removed for testing? Yes D No 0 NA es D No 0 NA Yes D No D NA VYes 0 No D NA <br /> Was sensor properly replaced andes 0 No 0 NA es 0 No DNA es ❑No ❑NA es ❑No ❑NA <br /> verified functional after testin ? <br /> Comments— includa i ormation on repairs madertor to testing. and recommended ollow-u or ailed tests <br /> t 4- <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.