Laserfiche WebLink
JUN 11 2000 6:17AM HP LASERJET 3200 <br />I <br />FF tr <br />F <br />STEP 3 <br />STEP 4 <br />.fad <br />C <br />Identify the damaged boot and select tholproper Blueline Repair <br />Boot based upon the number of studs ands the pipe OD. (See 2006 <br />Catalog, Section 10 and Appendix 1) <br />Remove band clamps from old fitting. Remove the nub from the <br />stubs and store for future use. Remove olO f tag. The old fitting <br />will need to be cut of Take cava not tolldemage the secondary <br />pipe <br />Install all Pellethene split components onto, the pipe careflally. All <br />Pdlethane pieces must be relsonded back together with Blue Seal <br />Glue. This is done by ensuring that the surOices are clean and dry. <br />Apply a liberal bead of Blue Sof andllbold the seam closed <br />securely until it is fne& It's helpfal to.u�4 the champs to loosely <br />boll .the boot closed during curing. Bo should <br />hold themselves closed within flus mianto Of there are no Krum <br />on them. The Blue Seal give will be fuly c In 40 minates. <br />Once all comments are bonded, apply oldberal bead of either <br />Parawalant 626, or Bostlk 1100FS to thelgaderside of the sul. <br />This will make the seal with the sump we#. Insert poly ring into <br />the gasket and position it onto the studs a" up against the sump <br />wail. <br />Relastall nub and tighten them In a star pagers. <br />ii <br />p.3 <br />