Laserfiche WebLink
ENHANCED VAPOR RECOVERY <br />In Match of 2000, the £alifomia Air Resources <br />Board adopted new, more stringent vapor recovery <br />requirements for gasoline dispensing facilities.:The; <br />new program is titled "Enhanced Vapor Recovery, <br />(EVR). EVR was developed to promote enhanced <br />vapor recovery system reliability, and to seek further <br />vapor emission reductions to meet both iaflforllja <br />and Federal Air Quality Requirem,4n, These <br />compliance requirements and ceitifi `voce <br />dures for vapor recovery equipment consSi`tute the <br />most stringent and comprehensive perfotmance <br />and reliability requirements in existence ftVapor <br />RecoverySystems. Phase 1 ' is "rtow ifl #t~Ce in <br />California. Additional EVR-requireme'n't; Ancfuding <br />those.for Phase 2 vapor recovery equipment, will <br />be phased in based on the timeline defined In the, <br />regulations (r uati M- goggorhtm} <br />Outside of Califorrlla,.' -- #,a components 9f� <br />EVR, is'being adopted or considerediin many areas r . <br />1 <br />Some important new requiremen"r.a certified= <br />EVR Phase 1 System include; <br />;& <br />• EVR. System Certification Test Protocol121"Al) <br />Phase t vapor recouery c�i�nponents must n <br />be installed, tested`, gn. as <br />w <br />a cote afete <br />Ee as <br />OPW 6500-EVR SERIES INTEGRATED MULTI-h®RT PRODUCT <br />FILL/VAPOR RECOVERY SPILL CONTAINMENT MANHOLE <br />FILL SPILL CONTAINER VAPOR RECOVERY SPILL CONTAINER <br />inte�ra as em <br />F DPW 61 SA-EVR SERIES DPW 611SK-4400-EVR ";CiPW 61 VSA-EVR <br />• r System Efficiency MUSt i Ufa eXCe , n SWIVEL FILL ADAPTOR JACK SCREW DROP TUBE SERIES SWIVEL <br />No Versu 'th+e95%pre iailsly required:' LOCKDOWN DEVICE VAPOR ADAPTOR <br />•System Performance AllowatalC <br />aM <br />faco"mponenis sucks as spill corlf aIF d � <br />vafves, ovelf(f valves, ar�dies iirercu n <br />vents have been reduced lay o: <br />• E !System a idl?Il�ty tJperatlftg test penoER/634LPC -EVR/171ILPC 63TT <br />for certification Of a Complete system has been PRODUCT FILL VAPOR RECOVERY <br />increased to. a minimum -t&480 days from the, 9- ` DUST CAP DUST CAP <br />day individual component f rind previo�lsy'. <br />required: Periodicfioltow-tip rtg of the vapor <br />recovery systems and coinpondi at -gasoline <br />dispensing systems] s required. <br />EVR, and itsVtechnol®gy fo&cing standards, . <br />{ has raised the!bafor petroleum equipment <br />,manufacturers ind tlttank ownexs.0PW 1; <br />fesporrtd-bithls challenge by fe,rz `£7 <br />considerable resources b t bnd, <br />The result is the completer+ r"d DPW <br />EVR Certified P 1 System desi r µ, <br />manufactured, and certified T , <br />industry's lea ` 'tarifae ntr <br />Wj OPW 61 SA- 61 VSA-EVR <br />ROTATABLE SWIVEL ROTATABLE SWIVEL <br />ADAPTOR - FILL PORT ADAPTOR — VAPOR PORT <br />USA Patent No. 5,664,951 USA Patent No. 5,664,951 <br />