Laserfiche WebLink
SWRCB, January 2002 <br />El <br />U <br />E <br />Page <br />Test Method Developed By: 0 Sump Manufacturer -'Industry Standard 11 Professional Engineer <br />11 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum 21 ly- drostatic <br />0 Other (Specify) <br />of <br />Test Equipment Used: <br />1 Equipment Resolution: <br />1w 21Z <br />I-IRRITIM. N.M. a <br />I <br />Height from Tank Top to Lowest <br />Electrical Penetratiow. <br />Condition of sump prior to testing. 1� <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects fiquid (both <br />product and water)?' <br />tt IQ <br />eYes 0 No <br />0 NA <br />CW17"WRIZ I <br />Was fail-safle verified to be <br />;I operationall' <br />Test Start Time: <br />Test End Time: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or Criteria: <br />Comments — (include information on repairs made prior to iaft and recommendedfollow-up for failed tests) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (*) is "NO" or "NX', the entire sump must be tested. (See SVMCB LG -160) <br />