Laserfiche WebLink
I SWRCB, January 2002 Is Page of <br />6. UNDER -DISPENSER CONTAPMEENT aTC) TESTING <br />Test Method Developed By: 0 UDC Manufacturer ff-Industry Standard D Professional —Engineer <br />0 Other (Spec) <br />Test Method Used: 0 Pressure 0 Vacuum Tyd—rostatic <br />0 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />all <br />R070140 M., <br />Emn-RIM. SPIN. - <br />AA <br />Height from TJDC Bottom to <br />Lowest Electrical Penetration- <br />4 <br />n f UDC nor to <br />Cnditioo <br />op <br />testing:• <br />Portion of UDC Tested <br />MUM <br />Doesturbinesin downwhen <br />UDC sensor detects liquid (both <br />0-Yies 0 No <br />i,(A <br />and water)?' <br />♦ Irm P, F, r. r og, A I a 1� U0 1 <br />?"111111.1r, f 11-.7t <br />rI S -MIN- <br />DNA's <br />As <br />Was fail-safie verified to be <br />1 operational? <br />Wait time between applying <br />pressure(vacuum/water and <br />test <br />�IITIMFTTR LIT11 <br />Sam. 11147M <br />WARM <br />a 7 Tri r, a i vv rmi R. <br />M <br />� <br />Was sensor removed for testing? <br />0 Yes 0 No <br />9 -NA <br />Comments — (mclude information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />%'- <br />"PQUJ -NC- Ars GR -L Adovc- 4W7-, <br />s-40TS boor) tJ/VPTS 4 AID 44G s 3r� -rjfI,9 /7-Jzl +- ft:Lc- <br />err* lo, <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to gny of the questions indicated with an <br />asterisk (*) is'NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />