Laserfiche WebLink
FROM : YOSEMITE 76 FAX NO. May. 05 2005 01:18PM P1 <br /> DcsiUnatad:Undergrou.pd Storane Tank (UST) OperatorM- ont.hly V45ual 1nspg,djon.,Ch.q�ck11st <br /> rdwt-- I of Y- <br /> 1 Date: o q <br /> Facility Name: <br /> V6*-44f Inspection Period, April 2005 <br /> Designated �per t : Eric W. Garcia <br /> or <br /> Address: 'a Expires- 11/24/2006 <br /> 69 ;C -tio <br /> e <br /> 1C Aifr6a 4044-UC <br /> Phone: (92*5)756-1210 <br /> City: Zip Code: -�k Si tures <br /> 1.. Monitorin� Ala <br /> j ;>U11Z17 <br /> 01.1 (a) Is the monitoring system is powered on and in proper operating mode? <br /> 0D (b) is the monitoring system not currently showing any alarms or completed and available for review? <br /> warnings? <br /> - <br /> XU Q <br /> (c) Has the alarm history report/log for the previous month been c <br /> I f40 3 (d) Has each alarm for the previous i i iui iU i has been responded to appropriately? <br /> 010 (e)The sensors located in tank-top containment sumps have not alarmed in the past month? <br /> NOTE:1)A list all non-inventory alWITM weneretea;;ince the last in--peolion N-1-been noted on Page 2 Of this:10M.2)SUr"I's where in-jIgTn has occurred in the past month must be <br /> inspected unless;I qjj:jIirjed sorvice le;;hniclan responded to,and properly addrcrrod We cause of the zllaffn- <br /> P2.ORwxr <br /> ,jtq113.0,-S <br /> ,V,, <br /> Documentation History <br /> � � Z <br /> 2.1 Permits &Associated Documentation <br /> Ab (a)Air Quality Management District Permit to Operate exp-—6-6,3-0-2=4�---, <br /> ;ZU (b) Local Jurisdiction Permit to Operate exp. /y -si.- g4--cts--' <br /> (c) Hazardous materials Business Platt (HMBP) <br /> E3 (d) Certification of Financial Responsibility <br /> (e) State UST Forms A& B <br /> O (f) UST Monitoring Plan <br /> 2002 2003 2004 2005 <br /> 2.2 LIST syst,ems Testing Documentation <br /> --—----------- 1��---—------ <br /> 1 p (a) seculijai-y Containment Testing 579R� <br /> (b) Spill Bucket Testi-ig <br /> (c) UST Monitoring System Certification Z-4—:— —4y 4°''S- <br /> 1 (d) Leak Detector Testing <br /> 2.3 Vapor Recovery System Testing Documentation <br /> Phase I Enhanced Vapor Recovery(EVR) Testing <br /> 6s <br /> (a)TP-201.1 B:Static Torque of Rotatable Phase I Adaptors <br /> f000 <br /> L-1 Q 4 (u)-rr- P-0 1.4 0,;.—A,--I- f n—r T,ihpinmin valve Assembly <br /> �Q El (c)TP-201.1 L)' Leak Rate of Drop Tube overfill Prevention Device& <br /> spiii Container Drain Valves <br /> (d)TP-201.1 E:Leak Rate and cracking Pressure of Pressure/Vacuum <br /> Sj <br /> Vent Wives <br /> Phase 11 Testing 00 es <br /> f <br /> (e) ST-30 (Tp--oI.a),Static Pressure integrity(Pressure Decay)Test <br /> :: <br /> Removing Device Test <br /> (f)ST-37(I F.-2aim'Liquid <br /> Balance System <br /> /0 U (g) ST-27 (Tp-201,4): Dynamic Backpressure Test V3 <br /> -Asssys <br /> Vacuum it Stem 2P4.157.0--S' V3-.716 <br /> 3 <br /> LiD (h) ST-39 Air to Liquid Volumetric Ratio(AIL)Test A 3 <br /> 2.4 Required Daily/Monthly Logs <br /> 100 (a) Stage I crr,kFair,wo-i) &Stage 11 <Daily> <br /> �00 (b)Vapor Recovery Maintenance Log:<Repairs or Malntenance��, <br /> Monthly Monitor Printouts/Alarm Log;<Daily> <br />