My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2015-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 2:05:16 PM
Creation date
6/3/2020 9:50:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2019
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231497_1097 YOSEMITE_2015-2019.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />❑ Piping Manufacturer X Industry Standard El Professional Engineer <br />0 Other (Spec) <br />Test Method Used: <br />X Pressure <br />El Other (Specify) <br />❑ Vacuum 0 Hydrostatic <br />Test Equipment Used: Test gage <br />I= <br />0-30"psi <br />Piping Run # 87's <br />Piping Run # 91's <br />Equipment Resolution: .00 <br />Piping Material: <br />Poly <br />Poly <br />Piping Manufacturer: <br />Environ <br />Environ <br />J AN 0 7 2 D i n <br />Piping Diameter: <br />1.5" <br />1.5" <br />Length of Piping Run: <br />Product Stored: <br />100' <br />Gasoline <br />100' <br />Gasoline <br />Method and location of <br />i in -run isolation: <br />Test boots in STP's <br />Test boots in STP's <br />Wait time between applying <br />pressure/vacuum/water and <br />start' test: <br />15 min. <br />15 min. <br />Test Start Time: <br />11:15am <br />11:45am <br />Initial Reading (Rj): <br />5"psi <br />5"psi <br />Test End Time: <br />12:15pm <br />12:45pm <br />Final Reading (RF): <br />511psi <br />5"psi <br />Test Duration: <br />lhr. <br />Mr. <br />Change in Reading (RF-RI): <br />None <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />.00 <br />.00 <br />Test Result: <br />X `Pass U Fail <br />X Pass u Fail <br />Comments — (include information on repairs made prior to testing•, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.