Laserfiche WebLink
R � <br />4 <br />Page 4 of 7 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: 0 Sump Manufacturer X Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure ❑ Vacuum X Hydrostatic <br />0 Other (Spec) <br />Test Equipment Used: Incon TS STS <br />Equipment Resolution: .002 <br />Sump # 87 <br />Sump # 91' <br />r, <br />Sump Diameter: 42" <br />42", <br />Sump Depth: <br />4.5' <br />4.5' <br />Sump Material: <br />Fiber/Steel <br />Fiber/Steel <br />J„ <br />Height from Tank To to To of <br />p <br />12" <br />12" <br />N1 H <br />Highest Piping Penetration: <br />a <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />10" <br />10" <br />Condition of sump prior to testing: <br />Dusty <br />Dusty <br />Portion of Sump Tested' <br />Full <br />Full <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />0 Yes ❑ No 0 NA <br />0 Yes 0 No ❑ NA <br />product and water)?' <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />0 Yes ❑ No ❑ NA <br />0 Yes 0 No ❑ NA <br />shutdown?` <br />Was fail-safe verified to be <br />D Yes ❑ No ❑ NA <br />0 Yes ❑ No 0 NA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />15 min <br />15 min <br />test: <br />Test Start Time: <br />12:40pm <br />11:44am <br />Initial Reading (Ri): <br />2.9820 <br />3.9979 <br />Test End Time: <br />12:56pm <br />11:59am <br />Final Reading (RF): <br />2.9824 <br />3.9982 <br />Test Duration: <br />15 min <br />15 min <br />Change in Reading (RF-Ri): <br />+.0004 <br />+.0003 <br />Pass/Fail Threshold or Criteria: <br />.002 <br />.002 <br />Test Result: ' <br />X Pass U Fail <br />X Pass U Fail <br />Was sensor removed for testing? <br />X Yes 0 No ❑ NA <br />X Yes 0 No ❑ NA <br />Was sensor properly replaced and <br />X Yes 0 No DNA <br />X Yes ❑ No U NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />