Laserfiche WebLink
0 <br /> 5. A cross sectional diagram of the tank and piping system, including secondary <br /> containment, striker plates, location of all sensors and probes, overflow protection <br /> equipment, extension of all pipes, and all appurtenances. <br /> 6. Tank model information, tank cut-sheet and installation instruction manual. The plan <br /> shows a liquid-filled annular space, the application shows a dry annular one. <br /> 7. Cut-sheet, specification and location of all sensors. The application indicates the <br /> location for piping monitoring is in the annular space, is this correct? If so,please <br /> submit diagram of that location. Item 35-37 on page 2DWF-5 of your plan are not <br /> listed in LG 113 or Veeder Root cut-sheet. <br /> 8. Cut-sheet for flex boots or secondary containment for flex hose/connector. The plan <br /> shows fiberglass fitting and flex boots will be used over the Teleflex; please explain. <br /> 9. Cut-sheet and dimension, including depth, for dispenser sumps. <br /> 10. Information and cut-sheet for dispensers. <br /> 11. Site-specific buoyancy calculation. <br /> 12. Page 2DWF-5 indicates Titeflex/Teleflex for item 5 and 29, AO Smith or Ameron for <br /> item 41-43; please specify and provide a site-specific information and cut-sheet. <br /> 13. Contractor's certificate of training, issued by tank and piping manufacturer. <br /> Please submit above information to me. If you shall have any questions please contact <br /> me at 209-468-3444. <br />