Laserfiche WebLink
11/1611998 16:23 9163731172 WALTON ENGINEERING PAGE 02 <br /> RECEIVED flAY <br /> MUMM imp <br /> : a ,UMEWOKM t•S4• to <br /> •Swwol v oF A.0 6w ym copawrON <br /> CERTXFXCATXOIT OF JL Ca <br /> This is to certify that on mmil 19, 1991 the following <br /> employees of <br /> attended a seminar detailing the proper procedures to be used when <br /> installing Smith Fiberglass Products' UL/ULC listed fiberglass <br /> piping systems for use in conveying underground petroleum products. <br /> The piping installation procedures were directly in accordance with <br /> the following Smith Fiberglass Products instruction manuals. <br /> 1. Manual B2160 - „General Installation Instructions <br /> for 'UL Listed RED De II <br /> Pipe and Fittings" (Part 1 & 2) <br /> 2. Manual F6600 - "Assembly and Operating Instructions <br /> for 1"-6" Field Tapering Tool" <br /> One copy of this certification is provided for each company parti- <br /> cipating. Please distribute copies to each attendee. Theper- <br /> sonnel attending e as follows: <br /> Richard S. Walton Rick Kelley <br /> Randy Rogers Mark S. Vendeirc <br /> Dennis A. Garner Ted Combrink <br /> Mike Norris Robert Adair <br /> Gary Dashicll Matt Stephens <br /> Tom Cota Dwayne Theobald <br /> Robert M. Fuller Harlod Sider <br /> t " <br /> April 29, 1991 <br /> Date �. .. <br />