My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:00:13 PM
Creation date
6/3/2020 9:50:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. 2L Tanks subject to floatation. [Section 2635 (a) (7)] <br />4 <br />41-1 <br />A. Anchored by deadman or slab. <br />B. Anchors to be installed as specified by manufacturer. <br />C. Installation details provided on plans. <br />D. Calculations provided. <br />17. SPILL AND OVERFILL PREVENTION <br />Underground storage tank equipped with spill container and an overfill prevention system. (detail drawing of spill <br />container(s)/piping sump(s) required, including tank fill and all openings). <br />A. Spill container [Section 2635 (b) (1)]. <br />If made of metal, exterior wall protected from galvanic corrosion. <br />X Capacity: (minimum of five gallons) LQ E) 5 <br />Equipped with a drain valve which allows drainage of spill into primary container. <br />Manufacturer: L22 �� L — � C Z\ L� <br />B. Overfill prevention system does not allow for manual override and meets one of the following requirements: <br />(1) Alert transfer operator at 90% full by restricting the flow into the tank or triggering an audible <br />and visual alarm [Section 2635(b)(2)(A)] . <br />Manufacturer: Model: -- <br />(2) Restrict delivery flow to the tank 30 minutes before overfill when tank is filled at no more than <br />95% capacity and activates an audible alarm at least five minutes before overfill [Section 2635 <br />(b) (2) (B)]. <br />Manufacturer: Model: <br />(3) Provide positive shut off at no more than 95% capacity [Section 2635 (b) (2) (C)]. <br />Manufacturer: Q) Model: A <br />(4) Provide positive shut-off of flow to the tank so that the fittings on top of the tank are not <br />exposed to the product overfilling [Section 2635 (b) (2) (D)]. <br />Manufacturer: Model: <br />18. PIPING INFORMATION <br />PIPING INFORMATION <br />TANK# TANK# TANK# TANK# <br />DISTANCE from <br />DISPENSER to TANK <br />S <br />MANUFACTURER <br />j <br />SYSTEM TYPE <br />CONSTRUCTION ** <br />MATERIAL *** <br />V\72--- <br />LEAK DETECTION SYSTEM <br />100% METHANOL COMPATIBILITY <br />YES NO <br />CORROSION PROTECTION <br />YES NO <br />* System Type; suction, pressure, and gravity <br />** Construction: single -walled, double -walled, lined -trench, etc. <br />*** Material Type; steel with cathodic protection, stainless-steel, fiberglass reinforced plastic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.