My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:00:13 PM
Creation date
6/3/2020 9:50:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance Services <br />Materials Consulting <br />Since 1954 <br />Now <br />Testing Engineers, Inc. <br />I (As <br />Work Request No.DV783 <br />Project No. 34741 1 Type of Inspection <br />Project: Gettler&—Ry n -- Stand-by <br />sff Station <br />_ia-�I-5 Job#9267.01 <br />Date <br />Hours <br />Inspector <br />6-3-97 <br />Singleton <br />Place of Inspection <br />Job Site <br />Report: <br />As requested, arrived at work site at 0840 hrs. Met with Mike <br />O'Sullivan of Gettler & Ryan to discuss job. Mr. O'Sullivan informed <br />me of there being a delay of starting due to anticipated arrival of <br />equipment needed to compact work area. Mr. O'Sullivan supplied copy <br />of curve for material supplied by Granite Construction. On standby <br />until 1130 hrs. After standby. proceeded to test material in 1 ft <br />lifts from -5' to -2' from F.G. and @ -0.5' from F.G. per Mr. <br />O'Sullivan. <br />Reviewed by <br />TerryChiccino, Soils/Asphalt <br />Field erations Manager <br />2cc: Gettler & Ryan <br />Corporate Office - 2811 Adeline Street, Oakland, California 94608 - (510) 835-3142 - FAX (510) 834-3777 <br />South/West Bay - 2123 Bering Drive, Suite E - San Jose, California 95131 - (408) 451-2420 - FAX (408) 451-2425 <br />East/North Bay - 827 Arnold Drive, Bay 4 - Martinez, California 94553 - (510) 370-7000 - FAX (510) 229-2951 <br />
The URL can be used to link to this page
Your browser does not support the video tag.