My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONIMRING SYSTEM CETIFATION <br /> For se By All Jurisdictions Within the State of Ca t ornia <br /> W AAl &d Chapter 6.7,Health and Safety Code; Chapter 16,Division 3, Title 23, California Code of Regulations <br /> # to document testing and servicing of monitoring equipment. A separate certification or report must be <br /> Orin control panel by the technician who performs the work. A copy of this form must be provided <br /> t er/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br /> within 30 days of test date. <br /> A. General Information <br /> Facility Name: y r L X 5 -74 Service Station No.: <br /> Site Address: &4ft2(-1+V-P T-P, City: Zip: 1i '3 z <br /> Facility Contact Person: sU e e-N Contact Phone No.: <br /> Make/Model of Monitoring System: v 2y5 S--o Date of Testing/Service: / ® i /o-7 <br /> B. Inventory of Equipment Tested/Certified <br /> Check the gppMpriate boxes to indicate "lc euniument in serviced. <br /> Tank ID: I- 5 4, . Tank ID: <br /> ETfn-Tank Gauging Probe: Model: OIn Tank Gauging Probe: Model: <br /> [Annular Space or Vault Sensor. Model: 7P 3 10 -yty OArumlar Space or Vault Sensor Model: <br /> 2FI'p-ing Sump/Trench Sensor(s): Model: -7?'<r7a -,zz�-j ElPiping Sump/Trench Sensor(s): Model: <br /> ®Fill Sump Sensor(s): Model: OFM Sump Sensor(s): Model: <br /> 20e-chanieal Line Leak Detector. Model: S i OMechanical Line Leak Detector. Model: <br /> CElecxrotiic Line Leak Detector Model: CEleetronic Line Leak Detector Model: <br /> OTank Overfill/Kgh-level Sensor: Model: OTank Overfill/High-level Sensor: Model: <br /> pother,S and model in Section E on Eme 2 []Other,S and model in Section E on Page 2 <br /> Tank ID: '2-- Tank ID: <br /> Hfn-Tank Ganging Probe: Model: - CIn-Tank Gauging Probe: Model: <br /> 3�hmuiar Space or Vault Sensor: Model: vv--a< []Annular Space or Vault Sensor Model: <br /> D iping Sump/Trench Sensor(s): Model: 7 o-�K []Piping Sump/Trench Sensor(s): Model: <br /> OFill Sump Sensor(s): Model: OFill Sump Sensor(s): Model: <br /> C�echanical Line Leak Detector. Model: Sr l--,4 LP OMechanical Line Leak Detector. Model: <br /> OElectronic Line Leak Detector Model: OElectromc Line Leak Detector Model: <br /> OTank OverfilUHigh-level Sensor. Model: OTank OverfiIUHigh-level Sensor: Model: <br /> ❑Other,S ui . and model in Section E on Page 2 []Other, S and model in Section E on PaLe 2 <br /> Dispenser ID: t-Z. Dispenser ID: 7-K <br /> ODispenser Containment Sensors: Model: ODispenser Containment Sensor(s): Model: <br /> hear Valve(s). EMear Valve(s). <br /> 05fispenser Containment Float s)and Chain s) Mfi Containment Floats and Chain(s) <br /> Dispenser ID: 3- Dispenser ID: <br /> ODispenser Containment Sensors: Model: ODispenser Containment Sensor(s): Model: <br /> EMhear Valve(s). O Shear Valve(s). <br /> giignnser Containment Float(!)and Chain(s) ODispmtscr Containment Float(s)and Chains <br /> Dispenser ID: s-%� Dispenser ID: <br /> ODispenser Containment Sensors: Model: ODispenser Containment Sensor(s): Model: <br /> C1'Shear Valve(s). O Shear Valve(s). <br /> 22igenser Containment Float(s)and Chain(s) ODi er Containment Floats)and Chain s <br /> *If the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at this facility. <br /> C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br /> manufacturers'guidelines. Attached to this Certification is information(e.g. manufacturers'checklists)necessary to verify that this <br /> information is correct and a Plot Plan showing the layout of monitoring equip! For any equipme capable of generating such <br /> reports,I have also attached a copy of the report;(check all that apply): ITSystem set-up AIa histo report <br /> Technician Name(Print): A-v r a �- f L� '`�'� Signature: <br /> Service Technician No.: g9 Qyl--c T— <br /> Certification No.: /+z-ry,- ` License No.: q qc;�t S-0 <br /> Testing Company Name: Champion Precision Testing, Inc Phone No.: (661) 363-7400 <br /> Pace 1 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.