Laserfiche WebLink
JO <br /> D. Results of TestingtServidn <br /> Software Version Installed: <br /> Complete the foliochecklist: <br /> Yes ❑ No* Is the audible alarm rational? <br /> es ❑ No* Is the visual alarm operational? <br /> ZZ Yes No* Were all sensors visually inspected,ftinctionally tested,and confirmed operational? <br /> Or'Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their pner ation? <br /> es ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ❑ N/A operational? <br /> Er'Ws ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) C3 Swnplfrench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? les; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> LIN/A mechanical overfill prevention valve is installed), is the overfill warring alarm visible and audible at the tank <br /> fill point(s and operatting properly? If so,at what ent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ONo Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If yes,describe causes in Section E,blow. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reparts,if a licable <br /> ❑ Yes No* Is all monitorin equipmento rational pSr manufacturer's s ifications? <br /> $In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: !F7 C,64e/c( A� -r 7'e acres <br /> 5c�5; 7'0 C— Xe 6 1--D fioLi� t Hcy `�EneSac�. <br /> 1I`3 &C4cc� <br /> Epi JT4 L a 'S" I.A(e.EED ft�c` ,/o As � r��c 7{-a--S7; <br /> Page 2 of 3 03/01 <br />