Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: eCheck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Tete the foil ing checklist: <br /> El Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ ;,*±;W=erea1l <br /> * ere all probes reinstalled properly? <br /> ❑ Yes ❑ items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lets the follo ing checklist: <br /> FUYes <br /> ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: E�g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ No* Was the testing apparatus properly calibrated? <br /> No* For mechanical LLDs,does theLLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ElN/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> Bl /A or disconnected? <br /> ❑ Yes ❑ NO For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> Lr N/A or fails a test? <br /> ❑ Yes ❑ N * For electronic LLDs,have all accessible wiring connections been visually inspected`? <br /> N/A <br /> Yes E3 NO* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: �O±y <br /> Page 3 of 3 03101 <br />