My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: Date of Testing/Servicing: le <br /> F. in-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foilowing-checklist: <br /> [3-yes 1 0 No* Has all input wiring been Wspected for proper entry and termination,including testing for ground faults? <br /> Eff'�Yes [I No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> MO'Yes. 0 No* Was accuracy of system product level readings tested? <br /> ®'Yes [I No* Was.accuracy of system water level readings tested? <br /> Yes 0 No* Were all probes reinstalled properly? <br /> Er Yes [I No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section X below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br /> Complete the loll checklist: <br /> ( Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> 0 NIA (Check all that apply) Simulated leak rate: 591g.p.h.'; 00.1g.p.h.2; El 0.2 gp.h.2 <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> EVY es. 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> R-Se_s M No* Was the testing apparatus properly calibrated? <br /> 2,,Ifes C] No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 N/A <br /> 0 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> R(N/A <br /> n Yes M No* For electronic LLDs,does the turbuic automatically shut off if any portion of the monitoring system is disabled <br /> ®''N/A or disconnected? <br /> 0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> Ur NIA malfunctions or fails a test'! <br /> 0 Yes 0 No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ar'Yes [3 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section%below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3'of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.