Laserfiche WebLink
LI <br />. Monitoring System Certification <br />�Jnqwel-' <br />Software Version Installed: <br />Compirete the following checklist: <br />11 <br />rij M�M.1 <br />�ra! <br />U. ON L. 7.Z, . I <br />M&SI-M <br />111 1 4 gill 91141411MOVI #) P. <br />RE 02"'M <br />I a ►Were <br />all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not inte6bre with <br />low M -If <br />alarms are relayed to a remote monitoring station, is aft communications equipment (e.g. modem) <br />perational? <br />For pressumed piping systems does the turbine automatically shut down if the piping secondary WRM�IIL <br />onnected? If VeS: <br />monitoring system detects a leak, fails to operate, or is elqctrically disc which sexism <br />fII <br />initiate positive shut -down? (Cheeck all that apply) U-Sump/Trench Sensors, 0 Dispenser Containment <br />Sensors. <br />Did you confm positive s1own due to leaks and sensor failure/dis;connection? 411!res' 0 No. <br />MM <br />. I <br />R <br />t <br />Was liquid knind inside any secondary containment systems designed as dr -v systems? (Check all that apply) <br />0 Product; 0 Water. If yes, describe causes in Section E, below. <br />I 11-- ILVI ) ZaL= 11,01.11 10MI11 M. M <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />